Planning application
Camp Farm Building Osier Lane West Beckham Norfolk NR25 6PL
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Extension to commercial workshop to provide workspace and w/c ground floor welfare space
As published by the council, reference PF/24/1570
Application record
- Reference
- PF/24/1570
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 24 Jul 2024
- Validated
- 16 Dec 2024
- Decided
- 28 Feb 2025
- Ward
- Gresham
- Parish
- West Beckham
- Decision by
- Delegated Decision
- Postcode
- NR25 6PL
Timeline
Dates from the published record
-
24 Jul 2024
Received by North Norfolk
-
16 Dec 2024
Validated
Checked as complete and ready for consideration.
-
28 Feb 2025
Decision issued: Approve
-
29 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Chaplin Farrant Ltd Agent, registered in Norwich
Active · incorporated 1990 · Norwich
261 applications on PlanIndex · across 18 councils · 96% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
- Officer report
- Approved full planning
- Existing plans & elevations
- Proposed plans & elevations
- Proposed plans & elevations
- Economic development
- Environmental health response
- Parish council comment
- Landscape response
- Bng statement
- Agents email re bng exemption 13-12-24
- Email from agent confirming he is still the agent but at chaplin farrant - 13.11
- Application form
- Existing plans and elevations
- Proposed plans and elevations
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Norfolk granted permission on 28 February 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Camp Farm Building Osier Lane West Beckham Holt Norfolk NR25 6PL
Extension to commercial workshop to provide first floor storage & welfare facilities on the ground floor
Decided Extension 2 docs -
Rear Of Camp Farm Workshops Wrights Corner Norfolk NR25 6PL
Remove 3no. antenna fixed to existing mast at 36m to be replaced by 3no. antenna fixed to existing mast at 35.45m and ancillary development thereto (Ref-P19-OO93(COM-OO247OO))
Decided -
1 Camp Farm Osier Lane West Beckham Holt Norfolk NR25 6PL
Single storey side extension to dwelling
Granted Householder Extension 14 docsSmall domestic
Other full applications
In North Norfolk
-
PF/24/0778 Withdrawn
Kingfisher Hotel 12 High Street Stalham Norwich Norfolk NR12 9AN
Change of use of vacant hotel (Class C1) to 8 self-contained flats (Class C3), external alterations
-
PF/26/1847 Awaiting decision
Briarwood Lodge Sheringwood Beeston Regis Sheringham Norfolk NR26 8TS
Change of use of detached residential annexe to a wellbeing studio for counselling and massage therapy (Class E)
-
PF/26/1844 Awaiting decision
Marlborough House 2 - 4 Cromer Road Mundesley Norwich Norfolk NR11 8BE
Change of use of first-floor flat (Class C3) to short-term holiday accommodation.
-
PF/25/0902 Granted
Forest Park Northrepps Road Northrepps Norfolk
Installation of sections of new footpath, along with upgrade of surfacing of existing areas used as permissive footpaths to create a single new connected walkway with rest stop areas and interpretation boards (part retrospective)
-
PF/26/0200 Granted
Land West Of 9 The Green Felbrigg Norfolk
Installation of a below-ground electricity supply to amenity land, together with associated engineering works including the formation of an earth bund and minor alterations to the site access (part retrospective).