Planning application
Woodlands Indoor Bowls Club And Leisure Centre Holt Road Upper Sheringham Sheringham Norfolk NR26 8TU
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Holiday caravan park with 28 static caravan pitches; access road and parking areas following demolition of the former Woodlands Leisure Centre and Indoor Bowls buildings
As published by the council, reference PF/23/0798
Application record
- Reference
- PF/23/0798
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 5 Apr 2023
- Validated
- 21 Apr 2023
- Decided
- 29 Apr 2025
- Ward
- Gresham
- Parish
- Bodham
- Decision by
- Delegated Decision
- Postcode
- NR26 8TU
Timeline
Dates from the published record
-
5 Apr 2023
Received by North Norfolk
-
21 Apr 2023
Validated
Checked as complete and ready for consideration.
-
29 Apr 2025
Decision issued: Approve
-
27 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
CD/26/1880 Awaiting decision
Woodlands Indoor Bowls Club And Leisure Centre Holt Road Upper Sheringham Norfolk
Discharge of conditions 3 (ecological mitigation and enhancement), 14 (surface water drainage) and 15 (foul drainage) of planning permission PF/23/0798 (Holiday caravan park with 28 static caravan pitches; access road and parking areas following demolition of the former Woodlands Leisure Centre and Indoor Bowls buildings)
Documents
Plans, drawings, consultee responses and the officer's report
62 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Norfolk granted permission on 29 April 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Woodlands Indoor Bowls Club And Leisure Centre Holt Road Upper Sheringham Norfolk
100% historically approved · decision due ~3 Nov
Discharge of conditions 3 (ecological mitigation and enhancement), 14 (surface water drainage) and 15 (foul drainage) of planning permission PF/23/0798 (Holiday caravan park with 28 static caravan pitches; access road and parking areas following demolition of the former Woodlands Leisure Centre and Indoor Bowls buildings)
Awaiting decision Conditions Demolition 6 docs -
Woodlands Caravan Park Holt Road Upper Sheringham Sheringham Norfolk NR26 8TU
6 single Birch and a group of 2 Birches and 3 Conifers to be removed
Decided Trees
Other full applications
In North Norfolk
-
PF/24/0778 Withdrawn
Kingfisher Hotel 12 High Street Stalham Norwich Norfolk NR12 9AN
Change of use of vacant hotel (Class C1) to 8 self-contained flats (Class C3), external alterations
-
PF/26/1847 Awaiting decision
Briarwood Lodge Sheringwood Beeston Regis Sheringham Norfolk NR26 8TS
Change of use of detached residential annexe to a wellbeing studio for counselling and massage therapy (Class E)
-
PF/26/1844 Awaiting decision
Marlborough House 2 - 4 Cromer Road Mundesley Norwich Norfolk NR11 8BE
Change of use of first-floor flat (Class C3) to short-term holiday accommodation.
-
PF/25/0902 Granted
Forest Park Northrepps Road Northrepps Norfolk
Installation of sections of new footpath, along with upgrade of surfacing of existing areas used as permissive footpaths to create a single new connected walkway with rest stop areas and interpretation boards (part retrospective)
-
PF/26/0200 Granted
Land West Of 9 The Green Felbrigg Norfolk
Installation of a below-ground electricity supply to amenity land, together with associated engineering works including the formation of an earth bund and minor alterations to the site access (part retrospective).