Skip to content
PlanIndex Get alerts
Menu

Planning application

35 - 37 High Street Holt Norfolk

Granted North Norfolk PF/23/0124 Full Planning Permission

Works: Extension Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from offices (Class E) to two dwellings (Class C3) with first floor extension and external alterations

As published by the council, reference PF/23/0124

Application record

Reference
PF/23/0124
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
19 Jan 2023
Validated
20 Jan 2023
Decided
26 Apr 2023
Ward
Holt
Parish
Holt
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 19 Jan 2023

    Received by North Norfolk

  2. 20 Jan 2023

    Validated

    Checked as complete and ready for consideration.

  3. 26 Apr 2023

    Decision issued: Approve

  4. 28 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

8 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 35 - 37 High Street Holt Norfolk

    LA/23/0125 Submitted 19 Jan 2023 0m away

    Internal and external works associated with change of use from offices (Class E) to two dwellings (Class C3) and first floor extension

    Granted Heritage and listed buildings Extension 18 docs
    Several homes
  • Lion House 27-29 High Street Holt Norfolk NR25 6BN

    LA/21/0909 Submitted 29 Mar 2021 26m away

    Change of use of existing retail unit to bakery with cafe, restaurant and ancillary takeaway with associated internal and external alterations including the installation of extraction and ventilation equipment to facilitate the proposed use

    Granted Heritage and listed buildings 23 docs
  • Lion House 27-29 High Street Holt Norfolk NR25 6BN

    PF/21/0908 Submitted 29 Mar 2021 26m away

    Change of use of existing retail unit to bakery with cafe, restaurant and ancillary takeaway with associated internal and external alterations including the installation of extraction and ventilation equipment to facilitate the proposed use

    Granted Full applications 28 docs
  • 3 Norwich Road Holt NR25 6SA

    IS3/19/2019 Submitted 21 Nov 2019 30m away

    Proposed Dormer Window

    Decided Outline Loft or dormer Windows or glazing 2 docs
  • The Appleyard Kerridge Way Holt Norfolk NR25 6AR

    TW/21/2026 Submitted 27 Jul 2021 43m away

    T1 & T3 - reduce horse chestnuts and T2 - remove goat willow lifting granite sets in oustside eating area (trip hazard)

    Granted Trees 2 docs
  • 18 High Street Holt Norfolk NR25 6BH

    IS3/21/1908 Submitted 13 Jul 2021 63m away

    Installation of air conditioning units

    Decided Heritage and listed buildings

In North Norfolk

  • PF/26/0911 Granted

    Crayford And Abbs Weybourne Road Bodham Holt Norfolk NR25 6QJ

    Installation of external door, alteration to existing sign and internal alterations.

    29 Apr 2026 Full applications
  • PF/25/0902 Granted

    Forest Park Northrepps Road Northrepps Norfolk

    Installation of sections of new footpath, along with upgrade of surfacing of existing areas used as permissive footpaths to create a single new connected walkway with rest stop areas and interpretation boards (part retrospective)

    18 Apr 2025 Full applications
  • PF/26/0200 Granted

    Land West Of 9 The Green Felbrigg Norfolk

    Installation of a below-ground electricity supply to amenity land, together with associated engineering works including the formation of an earth bund and minor alterations to the site access (part retrospective).

    28 Jan 2026 Full applications
  • PF/26/1012 Granted

    Toll Barn Heath Road North Walsham Norfolk NR28 0JB

    Change of use of land from agricultural to residential associated with dwelling known as Toll Barn and erection of covered domestic swimming pool and machinery store

    13 May 2026 Full applications
  • PF/26/0494 Granted

    Caravan On Malthouse Lane Catfield Great Yarmouth Norfolk NR29 5AE

    Material change of use of land to use as a residential caravan site for 1 no. Gypsy/Traveller pitch comprising the siting of 1 no. mobile home, 1 no. touring caravan, 1 no. portacabin for ancillary residential use, associated hardstanding, fencing, new vehicle access and installation of a package treatment plant (Part retrospective)

    5 Mar 2026 Full applications