Planning application

The Hawthorns Thornage Road Sharrington Melton Constable Norfolk NR24 2PN

Granted North Norfolk PF/21/0442 Full Planning Permission

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of part of existing building and replacement with a detached timber clad building for agricultural storage and use

As published by the council, reference PF/21/0442

Application record

Reference
PF/21/0442
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
15 Feb 2021
Validated
21 Apr 2021
Decided
28 Jun 2021
Ward
Stody
Parish
Brinton and Sharrington
Decision by
Delegated Decision
Postcode
NR24 2PN

Timeline

Dates from the published record

  1. 15 Feb 2021

    Received by North Norfolk

  2. 21 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jun 2021

    Decision issued: Approve

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In North Norfolk

  • PF/25/2381 Granted

    58 Norwich Road North Walsham Norfolk NR28 0DX

    Demolition of barns, outbuildings and two storey house and erection of 6no. dwellings with associated infrastructure and works

    27 Oct 2025 Full applications
  • PF/26/0560 Granted

    River Cottage Hall Street Briston Melton Constable Norfolk NR24 2LQ

    Change of land from agriculture to garden/amenity land for use in association with River Cottage (retrospective)

    16 Mar 2026 Full applications
  • PF/26/0429 Granted

    Barn At End Of Hazelwood Lane Ridlands Road Briston

    Installation of ground mounted solar PV Panels for use by adjacent dwelling known as the Cowshed - (Retrospective)

    24 Feb 2026 Full applications
  • PF/26/0807 Granted

    Wishing Well The Street Happisburgh Norwich Norfolk NR12 0AB

    Erection of link extension to front of the existing Class C4 building (HMO) to incorporate existing converted garage following demolition of shed and section of garden wall

    17 Apr 2026 Full applications
  • PF/26/0911 Granted

    Crayford And Abbs Weybourne Road Bodham Holt Norfolk NR25 6QJ

    Installation of external door, alteration to existing sign and internal alterations.

    29 Apr 2026 Full applications