Skip to content
PlanIndex Get alerts
Menu

Planning application

Flats 1 & 2 24 Main Street Kilsyth Glasgow North Lanarkshire G65 0AQ

Granted North Lanarkshire 20/00980/FUL Planning Permission

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of Velux Windows

As published by the council, reference 20/00980/FUL

Application record

Reference
20/00980/FUL
Type
Planning Permission
Status
Decided - Permitted
Decision
Application Permitted
Received
27 Aug 2020
Validated
19 Apr 2021
Decided
1 Jun 2021
Ward
Kilsyth
Decision by
Delegated
Postcode
G65 0AQ

Timeline

Dates from the published record

  1. 27 Aug 2020

    Received by North Lanarkshire

  2. 19 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 1 Jun 2021

    Decision issued: Application Permitted

  4. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 5 Market Square Market Street Kilsyth North Lanarkshire G65 0AZ

    25/00880/CLP Submitted 13 Aug 2025 33m away

    Secondary glazing and mechanical extract vents installed in a dwelling within a Conservation Area.

    Granted Lawful development Windows or glazing 7 docs
    Domestic
  • Mathie Lennox Market Square Market Street Kilsyth North Lanarkshire G65 0AZ

    24/00696/FUL Submitted 1 Jul 2024 35m away

    Change of use of upper floor offices to form two flats and minor external alterations associated with this change and also arising from the subdivision of the ground floor offices to form two units

    Granted Full applications New dwelling 19 docs
    Several homes
  • Mathie Lennox Market Square Market Street Kilsyth North Lanarkshire G65 0AZ

    24/00757/LBC Submitted 17 Jul 2024 35m away

    Internal changes arising from the separation of the ground floor part of the building (one side will continue being the lawyers office and the other side will continue being the sports therapy clinic). The first will be separated from the ground floor to form 2 Flats with access from the rear of the building from the existing external staircase.

    Granted Heritage and listed buildings New dwelling 17 docs
    Several homes
  • Mathie Lennox Market Square Market Street Kilsyth North Lanarkshire G65 0AZ

    24/00844/CAC Submitted 14 Aug 2024 35m away

    Demolition of small outbuilding (to rear of Market Chambers)

    Granted Heritage and listed buildings Demolition 17 docs
  • 2 Main Street Kilsyth Glasgow North Lanarkshire G65 0AQ

    21/00883/FUL Submitted 28 May 2021 43m away

    Replacement Shopfronts to Lounge and Bar, External Cladding, Installation of First Floor Patio Door, Alteration to Roof and Alterations to Balcony and Replacement of Patio Doors with Window (Partially Retrospective)

    Granted Full applications Windows or glazing 14 docs
  • 3 King Street Kilsyth Glasgow North Lanarkshire G65 0AL

    22/00083/ADV Submitted 28 Jan 2022 67m away

    Sign Boards, Internally Illuminated Projecting Sign and Window Vinyls

    Granted Advertising Windows or glazing 5 docs

In North Lanarkshire

  • 25/01029/FUL Granted

    Former Pentland School Tay Street Townhead Coatbridge North Lanarkshire ML5 2NA

    Erection of 18 no. cottage flats with associated amenity space, parking and access road.

    22 Sep 2025 Full applications
  • 26/00573/FUL Withdrawn

    Coltness House Lark Way Strathclyde Business Park Bellshill North Lanarkshire ML4 3RB

    Change of use from Class 4 office premises to Class 1A private dental clinic including associated consultation and treatment rooms.

    19 May 2026 Full applications
  • 26/01087/FUL Awaiting decision

    116 Almond Road Abronhill Cumbernauld North Lanarkshire G67 3LW

    Extension to Dwelling to Provide Bedroom and Lounge for the Benefit of a Disabled Person

    27 Aug 2026 Full applications
  • 26/01088/FUL Awaiting decision

    2 Milncroft Farm Millcroft Road Cumbernauld North Lanarkshire G67 4AG

    Alterations and Extensions to Dwellinghouse

    27 Aug 2026 Full applications
  • 26/00548/FUL Granted

    15 Fraser Street Cleland North Lanarkshire ML1 5PW

    Attic Extension with Integral Accommodation

    14 May 2026 Full applications