Skip to content
PlanIndex Get alerts
Menu

Planning application

Memorial Hall Hall Lane Kimpton Hertfordshire SG4 8RD

Decided North Hertfordshire 23/01641/FP Full Planning Permission

Works: Demolition

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Erection of outbuilding following demolition of existing outbuilding (amended plans received 29.10.2024)

As published by the council, reference 23/01641/FP

Application record

Reference
23/01641/FP
Type
Full Planning Permission
Status
Decided
Decision
Conditional Permission
Received
6 Sep 2024
Validated
6 Sep 2024
Decided
5 Dec 2024
Ward
Kimpton Ward Historic
Parish
Kimpton Parish Council
Decision by
Delegated
Postcode
SG4 8RD

Timeline

Dates from the published record

  1. 6 Sep 2024

    Received by North Hertfordshire

  2. 5 Dec 2024

    Decision issued: Conditional Permission

  3. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 15 Canham Close Kimpton Hitchin Hertfordshire SG4 8SD

    21/01609/FPH Submitted 11 Jun 2021 161m away

    Erection of front elevation porch, first floor side extension over existing side extension and erection of rear orangery-style extension

    Decided Householder Extension 5 docs
    Small domestic
  • Tall Trees High Street Kimpton Hitchin Hertfordshire SG4 8PT

    22/02688/FPH Submitted 13 Oct 2022 171m away

    First floor front extension including insertion of front dormer window. First floor rear extension and insertion of two side first floor windows. Front entrance porch and insertion of ground floor front window following removal of existing garage door to facilitate garage conversion. Installation of external cladding. New rear balcony and balustrade (as a variation of planning permission 22/01185/FPH granted 09.06.2022) (as amended by plans received 14/12/22)

    Decided Householder Extension Loft or dormer +1 11 docs
    Small domestic
  • 85 High Street Kimpton Hitchin Hertfordshire SG4 8QL

    26/00935/FPH Submitted 9 Apr 2026 184m away

    Single storey rear extension following demolition of existing conservatory. Installation of box dormer to existing rear roofslope to extend existing loftspace.

    Decided Householder Extension Loft or dormer +1 11 docs
    Small domestic
  • The Birches 2 Claggy Road Kimpton Hitchin Hertfordshire SG4 8PZ

    23/00550/FPH Submitted 10 Mar 2023 210m away

    Single storey front extension to garage including insertion of front bay window following removal of existing garage door to facilitate conversion to create annexe

    Decided Householder Extension Windows or glazing 9 docs
    Small domestic
  • 65 Lloyd Way Kimpton Hitchin Hertfordshire SG4 8QS

    21/01956/FPH Submitted 25 Jun 2021 242m away

    Single storey rear extension

    Decided Householder Extension 9 docs
    Small domestic
  • 1a Hampden Kimpton Hitchin Hertfordshire SG4 8QH

    23/00137/FP Submitted 19 Jan 2023 276m away

    Erection of two semi-detached 3-bed dwellings with associated gardens and frontage parking provision following demolition of existing commercial building

    Decided Full applications Demolition

In North Hertfordshire

  • 26/02039/FP Awaiting decision

    77 Park Lane Old Knebworth Knebworth Hertfordshire SG3 6PP

    Erection of one detached three-bedroom dwelling including detached double garage with Air Source Heat Pump and soft and hard landscaping works following demolition of existing detached structures.

    3 Sep 2026 Full applications
  • 26/01924/FP Awaiting decision

    Former Big Cat Sanctuary Codicote Road Welwyn Hertfordshire AL6 9TU

    Erection of 109 residential dwellings with access, parking, hard and soft landscaping and public open space following demolition of all existing buildings and structures

    1 Sep 2026 Full applications
  • 26/01915/FP Awaiting decision

    Former Pavilion Jacks Hill Farm Jacks Hill Graveley Hertfordshire SG4 7EQ

    Conversion of the existing pavilion to form three 1-bed self-contained dwellings (Development already carried out).

    28 Aug 2026 Full applications
  • 26/01724/FP Awaiting decision

    134 High Street Kimpton Hitchin Hertfordshire SG4 8QP

    Erection of two semi-detached 3-bed dwellings following demolition of existing dwelling and double garage including landscaping, parking , bin and bike storage and installation of two air source heat pumps. Installation of pedestrian access.

    27 Aug 2026 Full applications
  • 25/03184/FP Decided

    Mill Farm High Street Whitwell Hitchin Hertfordshire SG4 8AG

    Conversion and extension of existing barn/outbuilding to create one two-bedroom dwelling. (amended plans received 05.02.2026).

    15 Jan 2026 Full applications