Water Tower Offley Hoo Farm Hoo Lane Offley Hertfordshire
Works: Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of one detached 3-bed dwelling following demolition of redundant water tower
As published by the council, reference 22/03301/FP
Application record
- Reference
- 22/03301/FP
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Conditional Permission
- Received
- 23 Dec 2022
- Validated
- 23 Dec 2022
- Decided
- 13 Feb 2023
- Ward
- Hitchwood Offa And Hoo Historic
- Parish
- Offley Parish Council
- Decision by
- Delegated
Timeline
Dates from the published record
-
23 Dec 2022
Received by North Hertfordshire
-
13 Feb 2023
Decision issued: Conditional Permission
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Hertfordshire granted permission on 13 February 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Great Offley House Kings Walden Road Offley Hitchin Hertfordshire SG5 3EA
On principal elevation (east and return gable on north side), restore existing sashes and frames with some bottom sashes replaced using 4mm float glass and replacement cills and replace dormer casements using 8.15 mm vacuum glazing. Replace existing secondary glazing with new thin frame heritage system. Install new secondary glazing to fanlight over door. On rear & mid-range and south elevation, retain outer frames but replace casements using 8.15 mm vacuum glazing and replacement cills. Redecoration of windows and doors (as amended by drawing nos. 206080-04; -05 and -06 received on 04.08.2026 and amplified by revised quotations received 15.08.2026).
Decided Heritage and listed buildings Loft or dormer Windows or glazing -
2 Rookery End Offley Hitchin Hertfordshire SG5 3EZ
Single storey rear extension and erection of detached rear garden shed and pagoda (Joint extension with No.3) (as a variation of planning permission reference 20/02964/FPH granted on 11.02.2021)
Granted Householder Extension 7 docsSmall domestic
Other full applications
In North Hertfordshire
-
26/00298/FP Decided
Hobbs Close Garage London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of one detached 4-bed dwelling following demolition of existing garage building as revision of previously approved planning permission 21/00298/FP granted 26.03.2021.
-
26/01022/FP Awaiting decision
Service Station Bedford Road Hitchin Hertfordshire SG5 2UG
Installation of parcel lockers following removal of existing locker and installation of paved pathway.
-
26/02400/FP Awaiting decision
Greenbanks London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of four dwellings including cycle storage, parking, hard and soft landscaping, and alterations to access layout following demolition of existing dwelling and other buildings.
-
26/02392/FP Awaiting decision
Land South Of 14 High Street Graveley Hertfordshire SG4 7LB
Erection of one detached self-build dwelling including parking, cycle store, bin store, Air Source Heat Pump, alterations to ground levels and soft and hard landscaping.
-
26/01937/FP Decided
Hitchin Town Hall Brand Street Hitchin Hertfordshire SG5 1HX
Decarbonisation works including provision of secondary glazing to existing windows, the provision of insulation to the roof void above the main hall, replacement of mechanical plant including the removal of gas boilers and the installation of Photovoltaic (PV) panels and Air Source Heat Pump (ASHP)