Skip to content
PlanIndex Get alerts
Menu

Planning application

3 And 3A Station Road Knebworth Hertfordshire SG3 6AP

Decided North Hertfordshire 21/00902/FP Full Planning Permission

Works: Windows or glazing

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Change of Use of first and second Floors (currently known as 3A Station Road) from one 2 bed flat (C3) to Dental Practice (E(e) as per the current use of the Ground Floor. Replace existing ground floor shopfront (3 Station Road, Knebworth).

As published by the council, reference 21/00902/FP

Application record

Reference
21/00902/FP
Type
Full Planning Permission
Status
Decided
Decision
Conditional Permission
Received
22 Mar 2021
Validated
22 Mar 2021
Decided
8 Jun 2021
Ward
Knebworth Ward Historic
Parish
Knebworth Parish Council
Decision by
Delegated
Postcode
SG3 6AP

Timeline

Dates from the published record

  1. 22 Mar 2021

    Received by North Hertfordshire

  2. 8 Jun 2021

    Decision issued: Conditional Permission

  3. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 17 Station Road Knebworth Hertfordshire SG3 6AP

    22/03156/FP Submitted 6 Jan 2023 60m away

    Change of use of a single room on first floor from office/store to tattoo parlour (Sui Generis)

    Decided Full applications 6 docs
  • 20 Station Road Knebworth Hertfordshire SG3 6AP

    19/02591/FPH Submitted 8 Nov 2019 86m away

    Formation of vehicular access onto Station Road

    Decided Householder 6 docs
    Domestic
  • 13 Pondcroft Road Knebworth Hertfordshire SG3 6DB

    21/01015/FPH Submitted 29 Mar 2021 86m away

    Single storey side and rear extension, insertion of rooflight to existing rear roofslope, reduction in size of existing rear extension rooflights and insertion of ground floor window and door to existing side elevation

    Decided Householder Extension Loft or dormer +1 6 docs
    Small domestic
  • The Surgery Station Road Knebworth Hertfordshire SG3 6AP

    19/02489/FP Submitted 23 Oct 2019 100m away

    First floor rear extension and conversion of existing doctors surgery into 6 x 1-bed flats including parking and amenity space

    Decided Full applications New dwelling Extension 13 docs
  • 25 Westland Road Knebworth Hertfordshire SG3 6AS

    21/00754/FPH Submitted 10 Mar 2021 106m away

    Single storey front elevation extension to existing detached garage (as a variation of planning permission reference 20/02713/FPH granted on 02.02.2021)

    Decided Householder Extension 8 docs
    Small domestic
  • Land At 137 London Road Knebworth Hertfordshire

    21/01756/DOC Submitted 25 May 2021 129m away

    Discharge of Condition 13 (Construction Management Plan) as attached to Planning Application 20/01526/FP granted on 25.09.2020

    Granted Conditions 2 docs

In North Hertfordshire

  • 26/02039/FP Awaiting decision

    77 Park Lane Old Knebworth Knebworth Hertfordshire SG3 6PP

    Erection of one detached three-bedroom dwelling including detached double garage with Air Source Heat Pump and soft and hard landscaping works following demolition of existing detached structures.

    3 Sep 2026 Full applications
  • 26/01924/FP Awaiting decision

    Former Big Cat Sanctuary Codicote Road Welwyn Hertfordshire AL6 9TU

    Erection of 109 residential dwellings with access, parking, hard and soft landscaping and public open space following demolition of all existing buildings and structures

    1 Sep 2026 Full applications
  • 26/01915/FP Awaiting decision

    Former Pavilion Jacks Hill Farm Jacks Hill Graveley Hertfordshire SG4 7EQ

    Conversion of the existing pavilion to form three 1-bed self-contained dwellings (Development already carried out).

    28 Aug 2026 Full applications
  • 26/01724/FP Awaiting decision

    134 High Street Kimpton Hitchin Hertfordshire SG4 8QP

    Erection of two semi-detached 3-bed dwellings following demolition of existing dwelling and double garage including landscaping, parking , bin and bike storage and installation of two air source heat pumps. Installation of pedestrian access.

    27 Aug 2026 Full applications
  • 25/03184/FP Decided

    Mill Farm High Street Whitwell Hitchin Hertfordshire SG4 8AG

    Conversion and extension of existing barn/outbuilding to create one two-bedroom dwelling. (amended plans received 05.02.2026).

    15 Jan 2026 Full applications