Planning application
Hornbeam Spring Wych Elm Spinney Lane Welwyn AL6
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of existing consent 01/01985/1 granted 27.05.02 to add 4 antennae, 3 dishes and 1 cabin to approved 30m tower.
As published by the council, reference 03/01125/1
Application record
- Reference
- 03/01125/1
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Conditional Permission
- Received
- 2 Jul 2003
- Validated
- 24 Jul 2003
- Decided
- 13 Nov 2003
- Ward
- Knebworth Ward
- Parish
- Knebworth Parish Council
- Decision by
- Southern Rural Committee
Timeline
Dates from the published record
-
2 Jul 2003
Received by North Hertfordshire
-
24 Jul 2003
Validated
Checked as complete and ready for consideration.
-
13 Nov 2003
Decision issued: Conditional Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
LCC UK Ltd. Agent
11 applications on PlanIndex · across 3 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Hertfordshire granted permission on 13 November 2003, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
2 Wych Elm Lane Welwyn AL6 9TG
Certificate of lawfulness for the conversion of garage into habitable space for a games room and store
Granted Lawful development -
22 Spinney Lane Welwyn AL6 9TF
Erection of glass canopy on the rear elevation of the property
Granted HouseholderDomestic -
Domestic
-
Land at Spinney Lane Rabley Heath Welwyn AL6 0QS
80% historically approved · decision due ~5 Jun
Cessation of existing commercial use and erection of 5 dwellings
Awaiting decision Full applicationsSeveral homes -
135 Wadnall Way Knebworth Hertfordshire SG3 6DT
Single storey rear extension and single storey side extension following demolition of existing side element
Granted Lawful development Extension Demolition 7 docsSmall domestic
Other full applications
In North Hertfordshire
-
26/00298/FP Decided
Hobbs Close Garage London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of one detached 4-bed dwelling following demolition of existing garage building as revision of previously approved planning permission 21/00298/FP granted 26.03.2021.
-
26/01022/FP Awaiting decision
Service Station Bedford Road Hitchin Hertfordshire SG5 2UG
Installation of parcel lockers following removal of existing locker and installation of paved pathway.
-
26/02400/FP Awaiting decision
Greenbanks London Road St Ippolyts Hitchin Hertfordshire SG4 7NJ
Erection of four dwellings including cycle storage, parking, hard and soft landscaping, and alterations to access layout following demolition of existing dwelling and other buildings.
-
26/02392/FP Awaiting decision
Land South Of 14 High Street Graveley Hertfordshire SG4 7LB
Erection of one detached self-build dwelling including parking, cycle store, bin store, Air Source Heat Pump, alterations to ground levels and soft and hard landscaping.
-
26/01937/FP Decided
Hitchin Town Hall Brand Street Hitchin Hertfordshire SG5 1HX
Decarbonisation works including provision of secondary glazing to existing windows, the provision of insulation to the roof void above the main hall, replacement of mechanical plant including the removal of gas boilers and the installation of Photovoltaic (PV) panels and Air Source Heat Pump (ASHP)