Planning application
Freshney Green Off Yarborough Road Grimsby North East Lincolnshire DN34 4HQ
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Details in discharge of Conditions 2 (materials), 4 (open space) 5 (code level 3) 9 (details of gate) pursuant to DC/597/12/YAR
As published by the council, reference DC/597A/12/YAR
Application record
- Reference
- DC/597A/12/YAR
- Type
- Details in Discharge (CON)
- Status
- Decided
- Decision
- Conditions Complied With
- Received
- 30 Jan 2013
- Validated
- 30 Jan 2013
- Decided
- 19 Mar 2013
- Ward
- Yarborough
- Decision by
- Delegated Powers
- Postcode
- DN34 4HQ
Timeline
Dates from the published record
-
30 Jan 2013
Received by North East Lincolnshire
-
19 Mar 2013
Decision issued: Conditions Complied With
-
23 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
North East Lincolnshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Freshney Green Phase 4 Sorrel Road Grimsby North East Lincolnshire
Reserved Matters application for the erection of 20 dwellings and associated infrastructure following outline approval DC/273/09/YAR
Granted Full applications 39 docsMajor scheme -
143 Yarborough Road Grimsby North East Lincolnshire DN34 4EE
Erect side and rear extension to enlarge existing rear conservatory with associated works
Granted Full applications Extension 14 docs -
Central Parade Freshney Green Off Yarborough Road Grimsby North East Lincolnshire DN34 4HQ
Non material amendment following DC/957/07/YAR and DC/273/09/YAR for the erection of 84 dwellings - Amendment to highway adjacent to plots 47 - 50 to provide 2m wide service margin and amendment to turning head adjacent to plot 55 to allow road adoption
Granted Amendments 4 docsMajor scheme -
Freshney Green Phase 4 Sorrel Road Grimsby North East Lincolnshire
Reserved matters application pursuant to applications DC/957/07/YAR and DC/273/09/YAR for the erection of 84 dwellings, parking, garages, landscaping, amenity area, associated works and infrastructure for Phase 4 & 7 in full and part of Phase 5.
Granted Full applications 94 docsMajor scheme -
Freshney Green Central Parade Phase 4 Grimsby North East Lincolnshire DN34 4HE
Non Material Amendment application pursuant to DC/957/07YAR and DC/273/09/YAR for erection of 84 dwellings - Plots 57-60 moved 1.5m south, plots 51-52 moved 2.5m back & the speed ramp adjacent to plot 59 moved
Decided Amendments 4 docsMajor scheme -
Freshney Parade Phase 4 Central Parade Grimsby North East Lincolnshire
Non Material Amendment application pursuant to DC/957/07/YAR & DC/273/09/YAR for the erection of 84 dwellings - Plot 51 location adjusted 2m
Decided Amendments 5 docsMajor scheme
Other condition discharge and variation applications
In North East Lincolnshire
-
DM/0629/26/CND Awaiting decision
Grimsby Audi Altyre Way Humberston North East Lincolnshire DN36 4RJ
Details in discharge of Conditions 6 (Construction Environmental Management Plan), 7 (Landscape and Ecological Management Plan) and Condition 8 (Habitat Management and Monitoring Plan) pursuant to DM/0347/26/FUL
-
DM/0627/26/CND Awaiting decision
Land On West Side Of Ladysmith Road Grimsby North East Lincolnshire DN32 9PL
Details in Discharge of Conditions 4 (Residential Travel Plan), 11 (Acoustic Details for Substation) and 14 (Flood Evacuation Plan) pursuant to DM/0656/25/FUL
-
DM/0543/26/CND Awaiting decision
12 Southfield Road Grimsby North East Lincolnshire DN33 2PL
Details in discharge of Condition 4 (Surface and Foul Water Drainage) pursuant to DM/0810/25/FULA
-
DM/0544/26/CND Awaiting decision
Bursar Primary School Bursar Street Cleethorpes North East Lincolnshire DN35 8DS
Details in discharge of Conditions 2 (Drainage), 5 (Ecological Enhancement), 6 (Landscaping), 7 (Bin and Cycle Storage), 11 (Remediation and Verification), 12 (Unsuspected Contamination) and 14 (Brickwork Repairs and Materials) pursuant to DM/1065/24/FUL
-
DM/0858/25/CND Awaiting decision
Haven Mill Garth Lane Grimsby North East Lincolnshire DN31 1RS
Details in Discharge of Conditions 3 (External Materials), 4 (Construction Management Plan), 12 (Noise Impact Assessment) and 18 (Footbridge) pursuant to DM/0679/24/FUL