Skip to content
PlanIndex Get alerts
Menu

Planning application

Beach Cottage Lane End Road Instow Bideford Devon EX39 4LE

Refused North Devon 80738 Full Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Construction of a single storey ground floor extension following approval 61843

As published by the council, reference 80738

Application record

Reference
80738
Type
Full Application
Status
Refused
Decision
Refused
Received
28 Aug 2025
Validated
8 Sep 2025
Decided
5 Dec 2025
Ward
INSTOW
Parish
INSTOW
Decision by
Delegated
Postcode
EX39 4LE

Timeline

Dates from the published record

  1. 28 Aug 2025

    Received by North Devon

  2. 8 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 5 Dec 2025

    Decision issued: Refused

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In North Devon

  • 82001 Granted

    Yarde Farm Stoke Rivers Barnstaple Devon EX32 7LN

    Erection of roof over cattle feed yard

    13 Jul 2026 Full applications
  • 81905 Granted

    Kew Cottage Langleigh Ilfracombe Devon EX34 8BG

    Demolition of attached garage together with erection of extension to provide additional living space, modification of driveway and replacement windows

    17 Jun 2026 Full applications
  • 81985 Granted

    Braemuir Buzzacott Lane Combe Martin Ilfracombe Devon EX34 0NL

    Erection of a glass porch

    6 Jul 2026 Full applications
  • 81825 Granted

    Myrtle Cottage East Street North Molton South Molton Devon EX36 3HR

    Replacement kitchen extension and replacement windows

    22 May 2026 Full applications
  • 81807 Granted

    27 Beechfield Road Fremington Barnstaple Devon EX31 3DB

    Part retrospective removal of boundary hedge and erection of a 1.8m fence

    19 May 2026 Full applications