Planning application

Land at Tinever Road North Devon Business Park Chivenor Barnstaple Devon EX31 4FP

Granted North Devon 78310 Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of an industrial building to provide up to 5 units (Classes B2, B8 and E mixed use) together with associated landscaping, parking and access (Amended description)

As published by the council, reference 78310

Application record

Reference
78310
Type
Full Application
Status
Approved
Decision
Approved
Received
15 Feb 2024
Validated
18 Apr 2024
Decided
19 Dec 2024
Ward
HEANTON PUNCHARDON
Parish
HEANTON PUNCHARDON
Decision by
Delegated
Postcode
EX31 4FP

Timeline

Dates from the published record

  1. 15 Feb 2024

    Received by North Devon

  2. 18 Apr 2024

    Validated

    Checked as complete and ready for consideration.

  3. 19 Dec 2024

    Decision issued: Approved

  4. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

39 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land off Tinever Road Chivenor Devon EX31 4FP

    81217 Submitted 19 Dec 2025 0m away

    Approval of details in respect of discharge of conditions 18 (Biodiversity Gain Plan) & Condition 19 ( Habitat Management and Monitoring Plan) attached to planning permission 79684 (Erection of a 66 bedroom care home for the elderly (Use Class C2) with associated access, car parking, landscaping and ancillary buildings)

    Granted Conditions 9 docs
  • Land off Tinever Road Chivenor Devon EX31 4FP

    81314 Submitted 19 Jan 2026 0m away

    Approval of details in respect of discharge of condition 11 (hard and soft landscape works) attached to planning permission 79684 (Erection of a 66 bedroom care home for the elderly (Use Class C2) with associated access, car parking, landscaping and ancillary buildings)

    Granted Conditions 7 docs
  • Plot 5 North Devon Business Park Tinever Road Chivenor EX31 4FP

    79147 Submitted 14 Aug 2024 0m away

    Variation of condition 6 (road construction) & variation of condition 8 (road construction) of planning permission 77224 (Erection of an industrial building to provide up to 5 units (Classes B2, B8 & E mixed use) together with associated landscaping, parking & access(Amended Description))

    Granted Amendments 29 docs
    Several homes
  • Land off Tinever Road Chivenor Devon EX31 4FP

    81061 Submitted 12 Nov 2025 0m away

    Approval of details in respect of discharge of condition 9 (pre-commencement drainage) attached to planning permission 79684 (Erection of a 66 bedroom care home for the elderly (Use Class C2) with associated access, car parking, landscaping and ancillary buildings)

    Granted Conditions 13 docs
  • Land off Tinever Road Braunton Devon EX31 4FP

    81948 Submitted 30 Jun 2026 0m away

    Approval of details in respect of discharge of condition 18 (surface water drainage) and discharge of the mandatory "Biodiversity Gain Condition" attached to planning permission 81418 (erection of a discount foodstore (Use Class E) with parking, alongside a standalone long-stay car park, with access, landscaping and other associated works)

    Decided Conditions 13 docs
  • Land off Tinever Road Braunton Devon EX31 4FP

    81418 Submitted 10 Feb 2026 0m away

    Erection of a discount foodstore (Use Class E) with parking, alongside a standalone long-stay car park, with access, landscaping and other associated works

    Granted Full applications 166 docs

In North Devon

  • 82001 Granted

    Yarde Farm Stoke Rivers Barnstaple Devon EX32 7LN

    Erection of roof over cattle feed yard

    13 Jul 2026 Full applications
  • 81905 Granted

    Kew Cottage Langleigh Ilfracombe Devon EX34 8BG

    Demolition of attached garage together with erection of extension to provide additional living space, modification of driveway and replacement windows

    17 Jun 2026 Full applications
  • 81985 Granted

    Braemuir Buzzacott Lane Combe Martin Ilfracombe Devon EX34 0NL

    Erection of a glass porch

    6 Jul 2026 Full applications
  • 81825 Granted

    Myrtle Cottage East Street North Molton South Molton Devon EX36 3HR

    Replacement kitchen extension and replacement windows

    22 May 2026 Full applications
  • 81807 Granted

    27 Beechfield Road Fremington Barnstaple Devon EX31 3DB

    Part retrospective removal of boundary hedge and erection of a 1.8m fence

    19 May 2026 Full applications