Skip to content
PlanIndex Get alerts
Menu

Planning application

73 -74 Boutport Street Barnstaple Devon EX31 1SR

Withdrawn North Devon 76290 Full Application

Works: New dwelling Extension Windows or glazing Several homes

Read from the description, not a valuation. How we read the register

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Conversion of 2 floors of offices and 1 existing apartment to 3 apartments. Replacement of second floor extension. Alterations to fenestration (amended description).

As published by the council, reference 76290

Application record

Reference
76290
Type
Full Application
Status
Withdrawn
Decision
Withdrawn
Received
22 Nov 2022
Validated
9 Feb 2023
Decided
5 May 2023
Ward
BARNSTAPLE CENTRAL
Parish
BARNSTAPLE
Decision by
Delegated
Postcode
EX31 1SR

Timeline

Dates from the published record

  1. 22 Nov 2022

    Received by North Devon

  2. 9 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 5 May 2023

    Decision issued: Withdrawn

  4. 5 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What withdrawal means

The process from here

The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.

The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In North Devon

  • 82001 Granted

    Yarde Farm Stoke Rivers Barnstaple Devon EX32 7LN

    Erection of roof over cattle feed yard

    13 Jul 2026 Full applications
  • 81905 Granted

    Kew Cottage Langleigh Ilfracombe Devon EX34 8BG

    Demolition of attached garage together with erection of extension to provide additional living space, modification of driveway and replacement windows

    17 Jun 2026 Full applications
  • 81985 Granted

    Braemuir Buzzacott Lane Combe Martin Ilfracombe Devon EX34 0NL

    Erection of a glass porch

    6 Jul 2026 Full applications
  • 81825 Granted

    Myrtle Cottage East Street North Molton South Molton Devon EX36 3HR

    Replacement kitchen extension and replacement windows

    22 May 2026 Full applications
  • 81807 Granted

    27 Beechfield Road Fremington Barnstaple Devon EX31 3DB

    Part retrospective removal of boundary hedge and erection of a 1.8m fence

    19 May 2026 Full applications