Planning application
Lindower Whiting Bay Brodick Isle Of Arran North Ayrshire KA27 8QS
Works: New dwelling Extension Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations and erection of extensions to detached dwelling house
As published by the council, reference 26/00378/PP
Application record
- Reference
- 26/00378/PP
- Type
- Planning Permission (Full)
- Status
- Approved with no Conditions
- Decision
- Granted As published: Approved with no Conditions
- Received
- 1 Jun 2026
- Validated
- 2 Jun 2026
- Decided
- 22 Jul 2026
- Ward
- Arran
- Parish
- Arran Community Council
- Decision by
- Delegated
- Postcode
- KA27 8QS
Timeline
Dates from the published record
-
1 Jun 2026
Received by North Ayrshire
-
2 Jun 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Decision issued: Approved with no Conditions
-
27 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
- Decision notice
- Report of handling
- Neighbour notification
- Application for planning permission
- Supporting statement
- Location plan and proposed site plan
- Cross section aa as proposed
- Existing elevations
- Proposed first floor plan
- Existing floor plans
- Front east elevation as proposed
- Proposed ground floor plan
- Long section bb
- Rear west elevation as proposed
- Side north elevation as proposed
- Side south elevation as proposed
- Sun shading analysis
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Ayrshire granted permission on 22 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Site To North Of Woodlea Cottage Whiting Bay Brodick Isle Of Arran
Erection of two detached dwellinghouses
Withdrawn Full applications 23 docs -
Site To North Of Woodlea Cottage Whiting Bay Brodick Ayrshire
Erection of 2 no. new dwelling houses including amendment to previously approved road layout
Granted Full applications New dwelling 26 docsSeveral homes -
Site To North Of Woodlea Cottage Whiting Bay Brodick Isle Of Arran
Renewal of unexpired planning permission 20/00662/PP for the erection of 2 no detached dwelling houses
Granted Full applications New dwelling 15 docsDomestic -
Site To North Of Woodlea Cottage Whiting Bay Brodick Isle Of Arran
Erection of 2 no detached dwelling houses
Granted Full applications New dwelling 17 docsDomestic -
Site To North Of Woodlea Cottage Whiting Bay Brodick Ayrshire
Amendment of planning permission 19/00300/PP to amend design of 1 and 1/2 storey dwelling house on Plot 6
Granted Full applications 16 docsDomestic -
Plot 6 Site To North Of Woodlea Cottage Whiting Bay Brodick Isle Of Arran
Erection of dwellinghouse (amendment of house design)
Refused Full applications 13 docsDomestic
Other full applications
In North Ayrshire
-
26/00447/PP Granted
Site To South Of Arran Heritage Museum Brodick Isle Of Arran North Ayrshire
Formation of new foot path
-
26/00324/PP Refused
Site To South East Of Farm Cottage Corriecravie Brodick Isle Of Arran North Ayrshire
Erection of detached dwelling house and formation of access
-
26/00477/PP Granted
Hunterston East 400kv Power Station West Kilbride North Ayrshire KA23 9QX
Substation security upgrades
-
26/00607/PP Awaiting decision
Boathouse Brodick Isle Of Arran North Ayrshire KA27 8AJ
Change of use to Class 3 (cafe)
-
26/00606/PP Awaiting decision
Ayrshire Central Hospital Kilwinning Road Irvine North Ayrshire KA12 8SS
Erection of 28 dwelling houses for social rent to include the demolition of existing buildings, formation of access roads, parking, open space, landscaping, SuDS and ancillary infrastructure