Skip to content
PlanIndex Get alerts
Menu

Planning application

Douglas Hotel Brodick Isle Of Arran North Ayrshire KA27 8AJ

Granted North Ayrshire 26/00124/PP Planning Permission (Full)

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal alterations and extension to front of hotel, bar and restaurant including replacement plant

As published by the council, reference 26/00124/PP

Application record

Reference
26/00124/PP
Type
Planning Permission (Full)
Status
Approved with no Conditions
Decision
Approved with no Conditions
Received
23 Feb 2026
Validated
2 Mar 2026
Decided
26 May 2026
Ward
Arran
Parish
Arran Community Council
Decision by
Delegated
Postcode
KA27 8AJ

Site history

Applications at this address on the North Ayrshire register

This site has had 3 applications since 2026: 3 approved, 0 refused.

  • 26/00388/LBC Granted

    Douglas Hotel Brodick Isle Of Arran North Ayrshire KA27 8AJ

    Internal and external alterations to form three new additional hotel rooms and staff accommodation and installation of one external flue, two extract fans and two air conditioning condenser units to the rear west elevation

    Decided 6 Aug 2026 Heritage and listed buildings
  • 26/00130/LBC Granted

    Douglas Hotel Brodick Isle Of Arran North Ayrshire KA27 8AJ

    Internal alterations and extension to front of hotel, bar and restaurant including replacement plant

    Decided 26 May 2026 Heritage and listed buildings

Timeline

Dates from the published record

  1. 23 Feb 2026

    Received by North Ayrshire

  2. 2 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 May 2026

    Decision issued: Approved with no Conditions

  4. 27 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 07/01236/PP (Approved subject to Conditions)
  • Application: 08/00020/LBC (Approved subject to Conditions)
  • Application: 10/00345/LBC (Approved subject to Conditions)
  • Application: 10/00347/PP (Approved subject to Conditions)
  • Application: 26/00130/LBC (Approved with no Conditions)

Who's behind it

Company information only, from the register and Companies House

Manson Associates F.A.O. Ross Manson Agent

4 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Buzzworks Hospitality Applicant, registered in Kilmarnock

Active · incorporated 1990 · Kilmarnock

4 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

  • Decision notice Decision · 26 May 2026
  • Report of handling Report · 26 May 2026
  • Proposed ground floor plan Approved Drawing · 08 May 2026
  • Proposed site plan Approved Drawing · 08 May 2026
  • Proposed west elevation Approved Drawing · 08 May 2026
  • Neighbour notification Neighbour Notification List · 03 Mar 2026
  • Application for planning permission Application Form · 24 Feb 2026
  • Proposed east elevation Approved Drawing · 24 Feb 2026
  • Proposed south elevation Approved Drawing · 24 Feb 2026
  • Proposed north elevation Approved Drawing · 24 Feb 2026
  • Proposed downtakings ground floor plan Approved Drawing · 24 Feb 2026
  • Location plan Approved Drawing · 24 Feb 2026
  • Existing west elevation Approved Drawing · 24 Feb 2026
  • Existing south elevation Approved Drawing · 24 Feb 2026
  • Existing north elevation Approved Drawing · 24 Feb 2026
  • Existing east elevation Approved Drawing · 24 Feb 2026
  • Existing site layout Approved Drawing · 24 Feb 2026
  • Existing second floor plan Approved Drawing · 24 Feb 2026
  • Existing lower ground floor plan Approved Drawing · 24 Feb 2026
  • Existing ground floor plan Approved Drawing · 24 Feb 2026
  • Existing first floor plan Approved Drawing · 24 Feb 2026
  • Design statement Report · 24 Feb 2026

Trade members open them from here.

Open the documents

What this grant of permission means

North Ayrshire granted permission on 26 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In North Ayrshire

  • 26/00447/PP Granted

    Site To South Of Arran Heritage Museum Brodick Isle Of Arran North Ayrshire

    Formation of new foot path

    26 Jun 2026 Full applications
  • 26/00324/PP Refused

    Site To South East Of Farm Cottage Corriecravie Brodick Isle Of Arran North Ayrshire

    Erection of detached dwelling house and formation of access

    6 May 2026 Full applications
  • 26/00477/PP Granted

    Hunterston East 400kv Power Station West Kilbride North Ayrshire KA23 9QX

    Substation security upgrades

    10 Jul 2026 Full applications
  • 26/00607/PP Awaiting decision

    Boathouse Brodick Isle Of Arran North Ayrshire KA27 8AJ

    Change of use to Class 3 (cafe)

    4 Sep 2026 Full applications
  • 26/00606/PP Awaiting decision

    Ayrshire Central Hospital Kilwinning Road Irvine North Ayrshire KA12 8SS

    Erection of 28 dwelling houses for social rent to include the demolition of existing buildings, formation of access roads, parking, open space, landscaping, SuDS and ancillary infrastructure

    4 Sep 2026 Full applications