Planning application
15 Rockland Park Largs North Ayrshire KA30 8HB
Works: Loft or dormer Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Revision of window arrangement on south dormer and revisions to north dormer, including addition of balcony and change of finish material to composite cladding.
As published by the council, reference 25/00382/PP
Application record
- Reference
- 25/00382/PP
- Type
- Planning Permission (Full)
- Status
- Approved with no Conditions
- Decision
- Approved with no Conditions
- Received
- 25 Aug 2025
- Validated
- 1 Sep 2025
- Decided
- 24 Sep 2025
- Ward
- North Coast
- Parish
- Largs Community Council
- Decision by
- Delegated Decision
- Postcode
- KA30 8HB
Timeline
Dates from the published record
-
25 Aug 2025
Received by North Ayrshire
-
1 Sep 2025
Validated
Checked as complete and ready for consideration.
-
24 Sep 2025
Decision issued: Approved with no Conditions
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
- Decision notice
- Report of handling
- Neighbour notification
- Existing ground floor plan
- Existing first floor plan
- Proposed ground floor plan
- Proposed first floor plan
- Existing and proposed north elevations
- Existing and proposed east elevations
- Existing and proposed south elevations
- Existing and proposed west elevations
- Location plan
- Application for planning permission
Trade members open them from here.
Open the documentsWhat this grant of permission means
North Ayrshire granted permission on 24 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
7B Rockland Park Largs Ayrshire KA30 8HB
Erection of single storey extension with formation of balcony to front of detached dwelling house
Granted Full applications New dwelling Extension 16 docsSmall domestic -
7B Rockland Park Largs North Ayrshire KA30 8HB
Erection of extensions to side and front of detached dwelling house including garage conversion
Granted Full applications New dwelling Extension 13 docsSmall domestic -
17A Rockland Park Largs Ayrshire KA30 8HB
External alterations to existing two-storey semi-detached dwelling house comprising rebuilding and enlargement of first floor and reprofiling of roof
Granted Full applications New dwelling 8 docsDomestic -
Site To North And West Of 7A Rockland Park Largs Ayrshire
Erection of detached dwelling house
Granted Full applications New dwelling 8 docsDomestic -
Wester Broom 134 Irvine Road Largs Ayrshire KA30 8EY
Garage conversion
Decided Lawful development 7 docs -
7 Rockland Park Largs North Ayrshire KA30 8HB
Replacement of main house pitched roof, with 600mm increase to ridge height formation of dormer extensions to front and rear and formation of decking
Granted Full applications Extension Loft or dormer +1 9 docs
Other full applications
In North Ayrshire
-
26/00447/PP Granted
Site To South Of Arran Heritage Museum Brodick Isle Of Arran North Ayrshire
Formation of new foot path
-
26/00324/PP Refused
Site To South East Of Farm Cottage Corriecravie Brodick Isle Of Arran North Ayrshire
Erection of detached dwelling house and formation of access
-
26/00477/PP Granted
Hunterston East 400kv Power Station West Kilbride North Ayrshire KA23 9QX
Substation security upgrades
-
26/00607/PP Awaiting decision
Boathouse Brodick Isle Of Arran North Ayrshire KA27 8AJ
Change of use to Class 3 (cafe)
-
26/00606/PP Awaiting decision
Ayrshire Central Hospital Kilwinning Road Irvine North Ayrshire KA12 8SS
Erection of 28 dwelling houses for social rent to include the demolition of existing buildings, formation of access roads, parking, open space, landscaping, SuDS and ancillary infrastructure