Skip to content
PlanIndex Get alerts
Menu

Planning application

Kilmarnock Barassie Golf Club Irvine North Ayrshire KA11 5AE

Withdrawn North Ayrshire 25/00374/PP Planning Permission (Full)

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Various land engineering works to modify golf course

As published by the council, reference 25/00374/PP

Application record

Reference
25/00374/PP
Type
Planning Permission (Full)
Status
Application Withdrawn
Decision
Withdrawn
Received
20 Aug 2025
Validated
12 Sep 2025
Decided
9 Oct 2025
Decision by
Delegated
Postcode
KA11 5AE

Site history

Applications at this address on the North Ayrshire register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • 26/00391/PP Granted

    Kilmarnock Barassie Golf Club Irvine North Ayrshire KA11 5AE

    Various land engineering works to modify golf course

    Decided 24 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 20 Aug 2025

    Received by North Ayrshire

  2. 12 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 9 Oct 2025

    Decision issued: Withdrawn

  4. 28 Jul 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

  • Withdrawn application confirmation Decision · 09 Oct 2025
  • Wsas consultation response Consultation Response · 03 Oct 2025
  • Links course routing configuration proposed holes 9 & 10 Drawing · 09 Sep 2025
  • Hillhouse course routing configuration proposed holes 3,4 & 6 Drawing · 09 Sep 2025
  • Contour plan for holes 9 and10 Drawing · 09 Sep 2025
  • Existing and proposed contour plan Drawing · 09 Sep 2025
  • Links course infrastructure drainage Drawing · 09 Sep 2025
  • Hillhouse course infrastructure drainage Drawing · 09 Sep 2025
  • Annex 1 comparison pre & post intervention Drawing · 09 Sep 2025
  • Annex 1 : comparison pre & post intervention Drawing · 09 Sep 2025
  • Gwda comparison pre & post intervention Drawing · 09 Sep 2025
  • Hillhouse course - areas 2 & 3 gwda comparison pre & post intervention Drawing · 09 Sep 2025
  • Impacted and proposed areas for annex 1 habitats & groundwater dependent area Drawing · 09 Sep 2025
  • Information for biodiversity net gain calculations Report · 09 Sep 2025
  • Design statement Report · 09 Sep 2025
  • Location plan Drawing · 20 Aug 2025
  • Application for planning permission Application Form · 20 Aug 2025

Trade members open them from here.

Open the documents

What withdrawal means

The applicant withdrew this application before North Ayrshire decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In North Ayrshire

  • 26/00447/PP Granted

    Site To South Of Arran Heritage Museum Brodick Isle Of Arran North Ayrshire

    Formation of new foot path

    26 Jun 2026 Full applications
  • 26/00324/PP Refused

    Site To South East Of Farm Cottage Corriecravie Brodick Isle Of Arran North Ayrshire

    Erection of detached dwelling house and formation of access

    6 May 2026 Full applications
  • 26/00477/PP Granted

    Hunterston East 400kv Power Station West Kilbride North Ayrshire KA23 9QX

    Substation security upgrades

    10 Jul 2026 Full applications
  • 26/00607/PP Awaiting decision

    Boathouse Brodick Isle Of Arran North Ayrshire KA27 8AJ

    Change of use to Class 3 (cafe)

    4 Sep 2026 Full applications
  • 26/00606/PP Awaiting decision

    Ayrshire Central Hospital Kilwinning Road Irvine North Ayrshire KA12 8SS

    Erection of 28 dwelling houses for social rent to include the demolition of existing buildings, formation of access roads, parking, open space, landscaping, SuDS and ancillary infrastructure

    4 Sep 2026 Full applications