Planning application
Hunterston Construction Yard Fairlie North Ayrshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Creation of a RAS (Recirculated Aquaculture System) Complex to include all buildings, access roads, parking, landscaping and other required infrastructure.
As published by the council, reference 24/00588/PPM
Application record
- Reference
- 24/00588/PPM
- Type
- Planning Permission (major)
- Status
- Approved subject to Conditions
- Decision
- Granted As published: Approved subject to Conditions
- Received
- 17 Jul 2024
- Validated
- 27 Aug 2024
- Decided
- 25 Apr 2025
- Ward
- North Coast
- Parish
- Fairlie Community Council
- Decision by
- Committee Decision
Site history
Applications at this address on the North Ayrshire register
This site has had 3 applications since 2023: 2 approved, 0 refused.
-
24/00444/PPM Granted
Hunterston Construction Yard Fairlie North Ayrshire
Construction of new quay wall, infilling of dry dock basin to upgrade existing marine construction yard, together with ancillary works, to include, site security fencing, lighting, removal of existing bund and sections of stone revetment, and surface water drainage work
-
23/00757/EIA Decided
Hunterston Construction Yard Fairlie North Ayrshire
EIA scoping for upgrade of the existing Hunterston Construction Yard (HCY) into a harbour facility with a large working platform.
Timeline
Dates from the published record
-
17 Jul 2024
Received by North Ayrshire
-
27 Aug 2024
Validated
Checked as complete and ready for consideration.
-
25 Apr 2025
Decision issued: Approved subject to Conditions
-
1 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
McInally Associates Ltd Fao Scott Graham Agent
4 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordBakkafrost Scotland Ltd Applicant, registered in Edinburgh
Active · incorporated 1987 · Edinburgh
8 applications on PlanIndex · across 3 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
103 documents on file for this application
- Committee report 23/04/2025
- Decision notice
- Hsen consultation response
- Fence detail
- Snh consultation response
- Flood consultation response
- Utility services report
- Engineer's response to planning
- Response to naturescot
- Fairlc consultation response
- Eh consultation response
- Consultation response snh
- Flood consultation response
- Sepa consultation response
- Marine consultation response
- Consultation response - roads
- Water response
- Wosas response
- Preliminary ecological appraisal and examination of impacts on ecological intere
- Ancillary tank layout
- Site schedule gia
- Archaeological desk based assessment
- Building abc
- Building d floor plan
- Building e floor plan
- Context plan
- Design and access statement part 1
- Design and access statement part 2
- Design and access statement part 3
- Drainage strategy
- Earthworks landscape plan
- Economic report
- Elevations and section of abc
- Elevations and section of building d
- Building f, administrative & education centre
- Energy statement
- Entrance and car park planting plan
- Existing and proposed flow path routes
- Existing overall levels site layout
- Flood risk assessment part 01
- Flood risk assessment part 02
- Storage 2 plans and elevations
- Storage 07 plans and elevations
- Floor plan 1 building f
- Floor plan 2 building f
- Floor plan 3 building f
- Geotechnical phase 1 desk study part 01
- Geotechnical phase 1 desk study part 02
- Landscape and visual appraisal
- Landscape design and access statement
- Landscape masterplan
- Location plan
- Noise impact assessment
- Overview site layout
- Pac report
- Phase ii geo-environmental report
- Planning statement
- Application for planning permission
- Proposed berm reinforcement details
- Proposed cut and fill layout
- Proposed drainage details sheet 1
- Proposed drainage details sheet 2
- Proposed external construction details
- Proposed external works site sections sheet 1
- Proposed external works site sections sheet 2
- Proposed foul water drainage site layout
- Proposed overall drainage layout
- Proposed overall hardstanding layout
- Proposed overall levels site layout
- Proposed overall removals site layout
- Proposed overall site layout
- Proposed overall vehicle tracing layout artic lorry overall plan
- Proposed overall vehicle tracing layout artic lorry sheet 1
- Proposed overall vehicle tracing layout artic lorry sheet 2
- Proposed overall vehicle tracing layout fire engine overall plan
- Proposed overall vehicle tracing layout fire engine sheet 1
- Proposed overall vehicle tracing layout fire engine sheet 2
- Proposed overall vehicle tracing layout fire engine sheet 3
- Proposed overall vehicle tracking layout coach overall plan
- Proposed overall vehicle tracking layout coach sheet 1
- Proposed overall vehicle tracking layout telehandler overall plan
- Proposed overall vehicle tracking layout telehandler sheet 1
- Proposed overall vehicle tracking layout telehandler sheet 2
- Proposed overall vehicle tracking layout truck and trailer overall plan
- Proposed overall vehicle tracking layout truck and trailer sheet 1
- Proposed permanent fencing layout
- Proposed surface water drainage site layout
- Roof plan building abc
- Roof plan building d
- Roof plan building e
- Roof plan building f
- Rsk letter to nature scot re marine issues
- Sections and elevations building e1-2
- Sections and elevations building e2-2
- Site elevations
- Site isometric nw
- Site isometric se
- Site perspectives
- Site plan existing
- Site plan proposed
- Transport statement
- Zoning sections 1 building f
- Zoning sections 2 building f
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
North Ayrshire granted permission on 25 April 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hunterston Construction Yard Fairlie Largs Ayrshire
Request for EIA screening opinion for the renewal of planning permission 18/00132/PP for the erection of Caisson gates and removal of existing bund
Withdrawn Outline
Other full applications
In North Ayrshire
-
26/00566/PP Granted
Croyde Alma Road Brodick Isle Of Arran North Ayrshire KA27 8AZ
Demolition of existing side extensions with replacement single side extension
-
26/00676/PP Awaiting decision
Roebank Hotel And Wedding Venue Roebank Road Beith North Ayrshire KA15 2DX
Part change of use of hotel/wedding venue to form dwellinghouse
-
26/00589/PP Granted
5 Bowfield Road West Kilbride North Ayrshire KA23 9LB
Erection of replacement detached double garage to include the demolition of existing timber garage
-
26/00606/PP Granted
Ayrshire Central Hospital Kilwinning Road Irvine North Ayrshire KA12 8SS
Erection of 28 dwelling houses for social rent to include the demolition of existing buildings, formation of access roads, parking, open space, landscaping, SuDS and ancillary infrastructure
-
26/00520/PP Granted
Overtoun Of Broadstone Gateside Beith North Ayrshire KA15 1HF
Siting of residential caravan for a temporary period of up to 5 years