Planning application
Noddsdale Cottage Largs Ayrshire KA30 8SL
Works: New dwelling Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of single storey side extension to detached dwelling house
As published by the council, reference 22/00602/PP
Application record
- Reference
- 22/00602/PP
- Type
- Planning Permission (Full)
- Status
- Approved with no Conditions
- Decision
- Approved with no Conditions
- Received
- 8 Aug 2022
- Validated
- 10 Aug 2022
- Decided
- 13 Sep 2022
- Ward
- North Coast
- Parish
- Largs Community Council
- Decision by
- Delegated Decision
- Postcode
- KA30 8SL
Timeline
Dates from the published record
-
8 Aug 2022
Received by North Ayrshire
-
10 Aug 2022
Validated
Checked as complete and ready for consideration.
-
13 Sep 2022
Decision issued: Approved with no Conditions
-
1 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Brisbane Mains Farm Brisbane Glen Road Largs North Ayrshire KA30 8SL
95% historically approved · decision due ~20 Oct
Replacement of roofing and installation of solar arrays to central byre
Awaiting decision Heritage and listed buildings 9 docs -
Brisbane Mains Farm Brisbane Glen Road Largs North Ayrshire KA30 8SL
97% historically approved · decision due ~20 Oct
Replacement of roofing and installation of solar arrays to central byre
Awaiting decision Full applications 8 docs -
Noddsdale House Largs North Ayrshire KA30 8SL
Erection of ground mounted solar panels
Granted Full applications 5 docs
Other full applications applications
In North Ayrshire
-
26/00538/PP Granted
Century Court Riverside Way Riverside Business Park Irvine North Ayrshire
Formation of extension to car park including the installation of EV chargers
-
26/00594/PP Awaiting decision
12 Carson Drive Irvine North Ayrshire KA12 8HR
Erection of first floor balcony (to south elevation) to include associated door opening; construction of raised rear terrace with associated steps and balustrading to rear; installation of additional rear window and enlargement of existing side window opening on ground foor (south elevation)
-
26/00588/PP Awaiting decision
Ardtalla Whiting Bay Brodick Isle Of Arran North Ayrshire KA27 8PZ
Formation of upper extension to enlarge dormer window on rear elevation of detached dwelling house
-
26/00589/PP Awaiting decision
5 Bowfield Road West Kilbride North Ayrshire KA23 9LB
Demolition of existing garage with replacement detached double garage
-
26/00503/PP Granted
8 Braefoot Girdle Toll Irvine North Ayrshire KA11 1BY
Erection of single storey extension to rear of mid-terraced dwelling house