Skip to content
PlanIndex Get alerts
Menu

Planning application

Ardlui Cottage Kings Cross Brodick Ayrshire KA27 8RB

Granted North Ayrshire 22/00055/PP Planning Permission (Full)

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of detached two storey dwellinghouse including demolition of existing cottage

As published by the council, reference 22/00055/PP

Application record

Reference
22/00055/PP
Type
Planning Permission (Full)
Status
Approved subject to Conditions
Decision
Approved subject to Conditions
Received
24 Jan 2022
Validated
26 Jan 2022
Decided
14 Mar 2022
Ward
Ardrossan And Arran
Parish
Arran Community Council
Decision by
Delegated Decision
Postcode
KA27 8RB

Timeline

Dates from the published record

  1. 24 Jan 2022

    Received by North Ayrshire

  2. 26 Jan 2022

    Validated

    Checked as complete and ready for consideration.

  3. 14 Mar 2022

    Decision issued: Approved subject to Conditions

  4. 1 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In North Ayrshire

  • 26/00538/PP Granted

    Century Court Riverside Way Riverside Business Park Irvine North Ayrshire

    Formation of extension to car park including the installation of EV chargers

    10 Aug 2026 Full applications
  • 26/00594/PP Awaiting decision

    12 Carson Drive Irvine North Ayrshire KA12 8HR

    Erection of first floor balcony (to south elevation) to include associated door opening; construction of raised rear terrace with associated steps and balustrading to rear; installation of additional rear window and enlargement of existing side window opening on ground foor (south elevation)

    1 Sep 2026 Full applications
  • 26/00588/PP Awaiting decision

    Ardtalla Whiting Bay Brodick Isle Of Arran North Ayrshire KA27 8PZ

    Formation of upper extension to enlarge dormer window on rear elevation of detached dwelling house

    31 Aug 2026 Full applications
  • 26/00589/PP Awaiting decision

    5 Bowfield Road West Kilbride North Ayrshire KA23 9LB

    Demolition of existing garage with replacement detached double garage

    31 Aug 2026 Full applications
  • 26/00503/PP Granted

    8 Braefoot Girdle Toll Irvine North Ayrshire KA11 1BY

    Erection of single storey extension to rear of mid-terraced dwelling house

    24 Jul 2026 Full applications