Skip to content
PlanIndex Get alerts
Menu

Planning application

40m SW of 29 Lower Carrogs Road, Mayobridge, Newry

Granted Newry, Mourne and Down LA07/2025/0763/F Full

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Dwelling and garage on infill site

As published by the council, reference LA07/2025/0763/F

Application record

Reference
LA07/2025/0763/F
Type
Full
Status
Determined
Decision
Granted
Received
17 Jun 2025
Validated
22 Jul 2025
Decided
28 Jul 2026
Ward
Derryleckagh

Timeline

Dates from the published record

  1. 17 Jun 2025

    Received by Newry, Mourne and Down

  2. 22 Jul 2025

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Decision issued: Granted

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Newry, Mourne and Down

  • 4 Moor Road, Ballyward, Castlewellan, Co. Down BT31 9TY

    1 No. proposed two storey dwelling with detached garage, on site of existing dwelling and garage (to be removed). Updating of existing entrance visibility and visibility splays under policy CTY3. (amended proposal description)

    2 May 2025 Full applications
  • LA07/2026/1050/F Awaiting decision

    2 John Mitchel Place, Newry, BT34 2BP

    Refurbishment of hall (continuance of use within Class D2 for use as a cinema / dance / concert hall / theatre) to include a bar and the addition of roof solar panels and alterations to the entrance on John Mitchell Place to include a new shopfront.

    4 Sep 2026 Full applications
  • LA07/2026/1037/F Awaiting decision

    24 Ballydonnell Road, Glovet, Downpatrick, BT30 8EP

    Granny Annex

    3 Sep 2026 Full applications
  • 86 Carsonstown Road Carsonstown Saintfield BT24 7EB

    Construction of new front single storey garage extension with extension of existing sun terrace balcony to front elevation (including new glazed balustrading) over new garage extension.

    16 May 2025 Full applications
  • LA07/2026/1032/F Awaiting decision

    86 Lismore, Crossmaglen, Newry, BT35 9ET

    Rear extension

    2 Sep 2026 Full applications