Planning application
Site adjacent to and north east of 50 Annalong Rd Ballymartin BT34 4PG (Amended address)
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed erection of 2no. infill dwellings, garages and associated works
As published by the council, reference LA07/2025/0730/F
Application record
- Reference
- LA07/2025/0730/F
- Type
- Full
- Status
- Determined
- Decision
- Granted
- Received
- 10 Jun 2025
- Validated
- 21 Jul 2025
- Decided
- 15 Jul 2026
- Ward
- Binnian
- Postcode
- BT34 4PG
Timeline
Dates from the published record
-
10 Jun 2025
Received by Newry, Mourne and Down
-
21 Jul 2025
Validated
Checked as complete and ready for consideration.
-
15 Jul 2026
Decision issued: Granted
-
7 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Dromara
22 applications on PlanIndex · across 3 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
50 Annalong Road, Ballymartin, BT34 4PG
Demolition of existing dwelling and erection of replacement dwelling and garage with associated works and alteration to rear boundary
Granted Full applications Demolition 19 docsDomestic
Other full applications applications
In Newry, Mourne and Down
-
LA07/2025/0572/F Granted
4 Moor Road, Ballyward, Castlewellan, Co. Down BT31 9TY
1 No. proposed two storey dwelling with detached garage, on site of existing dwelling and garage (to be removed). Updating of existing entrance visibility and visibility splays under policy CTY3. (amended proposal description)
-
LA07/2026/1050/F Awaiting decision
2 John Mitchel Place, Newry, BT34 2BP
Refurbishment of hall (continuance of use within Class D2 for use as a cinema / dance / concert hall / theatre) to include a bar and the addition of roof solar panels and alterations to the entrance on John Mitchell Place to include a new shopfront.
-
LA07/2026/1037/F Awaiting decision
24 Ballydonnell Road, Glovet, Downpatrick, BT30 8EP
Granny Annex
-
LA07/2025/0608/F Granted
86 Carsonstown Road Carsonstown Saintfield BT24 7EB
Construction of new front single storey garage extension with extension of existing sun terrace balcony to front elevation (including new glazed balustrading) over new garage extension.
-
LA07/2026/1032/F Awaiting decision
86 Lismore, Crossmaglen, Newry, BT35 9ET
Rear extension