Skip to content
PlanIndex Get alerts
Menu

Planning application

56 Burrendale Park Road, Newcastle, BT33 0JF

Granted Newry, Mourne and Down LA07/2025/0601/F Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retrospective application for erection of boundary wall to front and side of property & application for new gates, infill panels to wall, new garden room and pergola

As published by the council, reference LA07/2025/0601/F

Application record

Reference
LA07/2025/0601/F
Type
Full
Status
Site Inspection Complete
Decision
Permitted
Received
14 May 2025
Validated
10 Jun 2025
Ward
Murlough
Postcode
BT33 0JF

Timeline

Dates from the published record

  1. 14 May 2025

    Received by Newry, Mourne and Down

  2. 10 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 16 Mourne Rise, Newcastle, BT33 0HE

    LA07/2026/0949/F Submitted 12 Aug 2026 276m away

    97% historically approved · decision due ~13 Oct

    Extension & alterations to include replacing existing conservatory, accessible side extension with ramped access & front entrance porch

    Awaiting decision Full applications Extension 6 docs
    Small domestic
  • 21 Mourne Rise, Newcastle, BT33 0HE

    LA07/2025/0929/F Submitted 14 Aug 2025 293m away

    Proposed single storey extension to front/side of property with internal alterations and level access to front of property.

    Granted Full applications Extension 7 docs
    Small domestic
  • 85 Dundrum Road, Newcastle, BT33 0LN

    LA07/2026/0880/F Submitted 23 Jul 2026 301m away

    97% historically approved · decision due ~8 Oct

    Proposed front porch single storey extension, rear link single storey extension, remodelling of existing rear out building, window alterations to side ( north facing) elevation.

    Awaiting decision Full applications Extension Windows or glazing 15 docs
    Small domestic
  • 123 Dundrum Road Newcastle BT33 0LN

    LA07/2026/1011/F Submitted 26 Aug 2026 332m away

    97% historically approved · decision due ~22 Oct

    Block of 4 apartments with assocaited car parking & amenity space

    Awaiting decision Full applications New dwelling 7 docs
    Several homes
  • 6 The Orchard, Newcastle, BT33 0RJ

    LA07/2026/0140/F Submitted 5 Feb 2026 337m away

    97% historically approved · decision due ~2 Apr

    Proposed second storey side extension and single storey rear extension to dwelling

    Awaiting decision Full applications Extension 4 docs
    Small domestic
  • 30 Castlewellan Road, Newcastle, BT33 0JY

    LA07/2026/0752/F Submitted 24 Jun 2026 453m away

    97% historically approved · decision due ~24 Aug

    Extension and alterations to dwelling

    Awaiting decision Full applications Extension 7 docs
    Domestic

In Newry, Mourne and Down

  • 4 Moor Road, Ballyward, Castlewellan, Co. Down BT31 9TY

    1 No. proposed two storey dwelling with detached garage, on site of existing dwelling and garage (to be removed). Updating of existing entrance visibility and visibility splays under policy CTY3. (amended proposal description)

    2 May 2025 Full applications
  • LA07/2026/1050/F Awaiting decision

    2 John Mitchel Place, Newry, BT34 2BP

    Refurbishment of hall (continuance of use within Class D2 for use as a cinema / dance / concert hall / theatre) to include a bar and the addition of roof solar panels and alterations to the entrance on John Mitchell Place to include a new shopfront.

    4 Sep 2026 Full applications
  • LA07/2026/1037/F Awaiting decision

    24 Ballydonnell Road, Glovet, Downpatrick, BT30 8EP

    Granny Annex

    3 Sep 2026 Full applications
  • 86 Carsonstown Road Carsonstown Saintfield BT24 7EB

    Construction of new front single storey garage extension with extension of existing sun terrace balcony to front elevation (including new glazed balustrading) over new garage extension.

    16 May 2025 Full applications
  • LA07/2026/1032/F Awaiting decision

    86 Lismore, Crossmaglen, Newry, BT35 9ET

    Rear extension

    2 Sep 2026 Full applications