Planning application
56 Cyril Street Newport NP19 0DN
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
PROPOSED CHANGE OF USE OF COMMERCIAL WORKSHOP AND ASSOCIATED LAND TO RESIDENTIAL USE IN ASSOCIATION WITH THE DWELLING AT 56 CYRIL STREET
As published by the council, reference 24/0822
Application record
- Reference
- 24/0822
- Type
- Full
- Status
- Decided
- Decision
- Granted with Conditions
- Received
- 7 Oct 2024
- Validated
- 9 Oct 2024
- Decided
- 21 Nov 2024
- Ward
- Victoria
- Decision by
- Delegated
- Postcode
- NP19 0DN
Timeline
Dates from the published record
-
7 Oct 2024
Received by Newport
-
9 Oct 2024
Validated
Checked as complete and ready for consideration.
-
21 Nov 2024
Decision issued: Granted with Conditions
-
7 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Chipping Campden
442 applications on PlanIndex · across 30 councils · 81% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Newport granted permission on 21 November 2024, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
11 Coverack Road Newport NP19 0DS
81% historically approved · decision due ~23 Jul
PROPOSED CONVERSION OF 3 BEDROOM DWELLINGHOUSE (C3) TO 4 BEDROOM HMO (C4)
Awaiting decisionDomestic -
Land Adjacent To 2 Bishton Street Newport South Wales
ADVERTISEMENT CONSENT FOR THE REPOSITIONING OF 2NO. ILLUMINATED SIGN BOARDS
Refused Advertising 6 docs -
-
130 - 132 Corporation Road Newport South Wales NP19 0BH
PROPOSED CHANGE OF USE OF PART OF GROUND FLOOR FROM A1 USE CLASS TO A3 USE CLASS
Granted Full applications 23 docs -
Land To South East Of University Of Wales Newport City Campus Usk Way Newport South Wales
PARTIAL DISCHARGE OF CONDITION 12 (SAMPLE MATERIALS AND FINISHES) OF 23/0234 VARIATION OF CONDITION 1 (APPROVED PLANS) OF PLANNING PERMISSION 21/0893 CONSTRUCTION OF NEW LEISURE CENTRE
Granted Conditions 4 docs -
24 Llanwern Street Newport South Wales NP19 0BZ
CHANGE OF USE OF 3NO. BEDROOM DWELLING (C3 USE) TO 5NO. BEDROOM HMO (C4 USE) INCLUDING SINGLE STOREY REAR EXTENSION
Refused Full applications Extension 24 docsSmall domestic
Other full applications
In Newport
-
26/0397 Granted
Glen View Ponthir Road Newport South Wales NP18 3NW
DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION
-
26/0368 Granted
Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales
PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL
-
26/0216 Refused
Land Adjacent To Unit 3 Esperanto Way Newport South Wales
PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS
-
26/0010 Granted
The Grove Bowdens Lane Penhow Newport NP26 3AA
DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD
-
26/0241 Granted
Liberty Steel Corporation Road Newport NP19 4XE
ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES