Planning application
84 Queens Hill Crescent Newport NP20 5HG
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Replacement rear balcony and attached garage conversion
As published by the council, reference 24/0692
Application record
- Reference
- 24/0692
- Type
- Full
- Status
- Decided
- Decision
- Granted with Conditions
- Received
- 19 Aug 2024
- Validated
- 7 Oct 2024
- Decided
- 5 Dec 2024
- Ward
- Allt-yr-Yn
- Decision by
- Delegated
- Postcode
- NP20 5HG
Timeline
Dates from the published record
-
19 Aug 2024
Received by Newport
-
7 Oct 2024
Validated
Checked as complete and ready for consideration.
-
5 Dec 2024
Decision issued: Granted with Conditions
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
63 Queens Hill Crescent Newport NP20 5HG
LAWFUL DEVELOPMENT CERTIFICATE FOR A PROPOSED FRONT PORCH, LOFT CONVERSION WITH REAR FACING DORMER AND ROOFLIGHTS TO THE PRINCIPAL ELEVATION
Granted Lawful development Extension Loft or dormer 6 docsSmall domestic -
1 - 2 Fields Road Newport South Wales NP20 4PL
PARTIAL DISCHARGE (PARTS A-C) OF CONDITION 22 (CONTAMINATION) OF PLANNING PERMISSION 18/0507 HYBRID APPLICATION: OUTLINE PLANNING PERMISSION FOR THE DEMOLITION OF EXISTING BUILDING AND ERECTION OF UP TO 96NO. DWELLINGS (INCLUDING 14NO. AFFORDABLE DWELLINGS) AND ANCILLARY DEVELOPMENT, WITH ALL MATTERS RESERVED APART FROM THE PRINCIPLE OF MEANS OF ACCESS; AND FULL PLANNING PERMISSION FOR THE PARTIAL DEMOLITION OF 1 & 2 FIELDS ROAD AND CHANGE OF USE OF THE REMAINING PART TO A SINGLE DWELLING
Granted Conditions Demolition 9 docsMajor scheme -
1-2 Fields Road Newport NP20 4PL
PARTIAL DISCHARGE OF CONDITION 29 (REPTILE SURVEY) OF PLANNING PERMISSION 18/0507 FOR HYBRID APPLICATION: OUTLINE PLANNING PERMISSION FOR THE DEMOLITION OF EXISTING BUILDING AND ERECTION OF UP TO 96NO. DWELLINGS (INCLUDING 14NO. AFFORDABLE DWELLINGS) AND ANCILLARY DEVELOPMENT, WITH ALL MATTERS RESERVED APART FROM THE PRINCIPLE OF MEANS OF ACCESS; AND FULL PLANNING PERMISSION FOR THE PARTIAL DEMOLITION OF 1 & 2 FIELDS ROAD AND CHANGE OF USE OF THE REMAINING PART TO A SINGLE DWELLING
Granted Conditions Demolition 5 docsMajor scheme -
1-2 Fields Road Newport NP20 4PL
PARTIAL DISCHARGE OF CONDITION 4 (MEANS OF EMERGENCY ACCESS) OF PLANNING PERMISSION 18/0507 HYBRID APPLICATION: OUTLINE PLANNING PERMISSION FOR THE DEMOLITION OF EXISTING BUILDING AND ERECTION OF UP TO 96NO. DWELLINGS (INCLUDING 14NO. AFFORDABLE DWELLINGS) AND ANCILLARY DEVELOPMENT, WITH ALL MATTERS RESERVED APART FROM THE PRINCIPLE OF MEANS OF ACCESS; AND FULL PLANNING PERMISSION FOR THE PARTIAL DEMOLITION OF 1 & 2 FIELDS ROAD AND CHANGE OF USE OF THE REMAINING PART TO A SINGLE DWELLING
Granted Conditions Demolition 8 docsMajor scheme -
Queens Hill Education Centre Queens Hill Newport South Wales NP20 5XN
RESERVED MATTERS (APPEARANCE, LANDSCAPING, LAYOUT AND SCALE) FOR 76NO. HOMES INCLUDING ASSOCIATED WORKS, ROADS AND INFRASTRUCTURE (18/0507). PARTIAL DISCHARGE OF CONDITIONS 05 (DEMOLITION/CONSTRUCTION METHOD STATEMENT), 06 (CARRIAGEWAY AND FOOTWAY DETAILS), 07 (PHASED PLANTING PROGRAMME), 08 (BOUNDARY TREATMENT), 09 (SURFACE AND FOUL WATER DRAINAGE STRATEGY), 10 (MATERIALS PLAN), 13 (RESERVED MATTERS DETAILS), 14 (INFORMAL AND FORMAL RECREATION DETAILS), 15 AND 16 (RELATIONSHIP WITH SHIRE HALL), 17 (CROSS SECTIONAL AND FINISHED FLOOR LEVEL DETAILS), 19 AND 20 (NOISE SURVEYS/MITIGATION MEASURES), 23 (TREE PROTECTION PLAN), 26 (ARBORICULTURAL METHOD STATEMENT), 27 (APPOINTMENT OF ARBORICULTURALIST) AND 28 (DETAILS FOR REPLACEMENT PLANTING TO MITIGATE LOSS OF T50) RELATING TO OUTLINE PERMISSION 18/0507
Granted Reserved matters Demolition Trees 186 docsMajor scheme -
90 Queens Road Newport NP20 5EX
81% historically approved · decision due ~12 Oct
LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED) FOR A GARAGE CONVERSION TO A HABITABLE ROOM
Decided
Other full applications applications
In Newport
-
26/0397 Granted
Glen View Ponthir Road Newport South Wales NP18 3NW
DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION
-
26/0368 Granted
Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales
PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL
-
26/0216 Refused
Land Adjacent To Unit 3 Esperanto Way Newport South Wales
PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS
-
26/0010 Granted
The Grove Bowdens Lane Penhow Newport NP26 3AA
DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD
-
26/0241 Granted
Liberty Steel Corporation Road Newport NP19 4XE
ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES