Planning application
Newport Cathedral St Woolos King And Confessor Stow Hill Newport South Wales
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
INSTALLATION OF LIGHTING
As published by the council, reference 24/0659
Application record
- Reference
- 24/0659
- Type
- Full
- Status
- Decided
- Decision
- Granted with Conditions
- Received
- 2 Aug 2024
- Validated
- 12 Aug 2024
- Decided
- 12 Dec 2024
- Ward
- Stow Hill
- Decision by
- Delegated
Timeline
Dates from the published record
-
2 Aug 2024
Received by Newport
-
12 Aug 2024
Validated
Checked as complete and ready for consideration.
-
12 Dec 2024
Decision issued: Granted with Conditions
-
23 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
35 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
St Woolos Court Clifton Place Newport NP20 4EX
75% historically approved · decision due ~12 May
REPLACEMENT OF WINDOWS
Awaiting decision Full applications Windows or glazing 10 docs -
109-111 The Church House Stow Hill Newport NP20 4ED
VARIATION OF CONDITION 1 (APPROVED PLANS) OF 22/0762 CHANGE OF USE FROM PUBLIC HOUSE TO A MIXED USE COMPRISING RETAIL (A1), FINANCIAL AND PROFESSIONAL SERVICES (A2) IN COMMERCIAL UNIT, PROVISION OF CAFÉ / BAR (A3) (ALL ON THE GROUND FLOOR), AND PROVISION OF 5 NO. FLATS AND ASSOCIATED EXTERNAL WORKS. AMENDMENTS INCLUDE CREATION OF AN ADDITIONAL BEDROOM SERVING FLAT 1 TO CREATE A TWO BEDROOM FLAT AND ASSOCIATED ALTERATIONS
Granted Amendments New dwelling 15 docsSeveral homes -
109-111 The Church House Stow Hill Newport NP20 4ED
PARTIAL DISCHARGE OF CONDITIONS 2 (FENESTRATION), 3 (CILL DETAILS), 11 (CYCLE STORAGE) AND 12 (WASTE STORAGE) OF 22/0762 CHANGE OF USE FROM PUBLIC HOUSE TO A MIXED USE COMPRISING RETAIL (A1), FINANCIAL AND PROFESSIONAL SERVICES (A2) IN COMMERCIAL UNIT, PROVISION OF CAFÉ / BAR (A3) (ALL ON THE GROUND FLOOR), AND PROVISION OF 5 NO. FLATS AND ASSOCIATED EXTERNAL WORKS
Granted Conditions New dwelling Windows or glazing 14 docsSeveral homes -
28 Dewsland Park Road Newport NP20 4EF
81% historically approved · decision due ~17 Sep
PROPOSED CHANGE OF USE FROM A SUPPORTED LIVING PROPERTY FOR UP TO 6 PERSONS (USED C3B) TO A 6 BEDROOM HOUSE IN MULTIPLE OCCUPATION (USE CLASS C4)
Awaiting decision -
10 York Place Newport NP20 4GB
SINGLE STOREY REAR EXTENSIONS AND INSTALLATION OF AIR SOURCE HEAT PUMP.
Granted Full applications Extension 9 docsSmall domestic -
51 Dewsland Park Road Newport South Wales NP20 4EG
81% historically approved · decision due ~21 Sep
INSTALLATION OF EV CHARGING POINT
Awaiting decision
Other full applications applications
In Newport
-
26/0397 Granted
Glen View Ponthir Road Newport South Wales NP18 3NW
DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION
-
26/0368 Granted
Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales
PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL
-
26/0216 Refused
Land Adjacent To Unit 3 Esperanto Way Newport South Wales
PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS
-
26/0010 Granted
The Grove Bowdens Lane Penhow Newport NP26 3AA
DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD
-
26/0241 Granted
Liberty Steel Corporation Road Newport NP19 4XE
ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES