Skip to content
PlanIndex Get alerts
Menu

Planning application

Badgers Bend Chepstow Road Newport NP26 3AD

Granted Newport 22/1159 Full

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

PART SINGLE STOREY PART TWO STOREY SIDE EXTENSION

As published by the council, reference 22/1159

Application record

Reference
22/1159
Type
Full
Status
Decided
Decision
Granted with Conditions
Received
5 Dec 2022
Validated
7 Dec 2022
Decided
20 Apr 2023
Ward
Bishton And Langstone
Parish
Penhow Community Council
Decision by
Delegated
Postcode
NP26 3AD

Timeline

Dates from the published record

  1. 5 Dec 2022

    Received by Newport

  2. 7 Dec 2022

    Validated

    Checked as complete and ready for consideration.

  3. 20 Apr 2023

    Decision issued: Granted with Conditions

  4. 3 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Berkhamsted

15 applications on PlanIndex · across 3 councils · 83% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Newport

  • 26/0397 Granted

    Glen View Ponthir Road Newport South Wales NP18 3NW

    DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION

    18 May 2026 Full applications
  • 26/0368 Granted

    Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales

    PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL

    14 May 2026 Full applications
  • 26/0216 Refused

    Land Adjacent To Unit 3 Esperanto Way Newport South Wales

    PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS

    20 Mar 2026 Full applications
  • 26/0010 Granted

    The Grove Bowdens Lane Penhow Newport NP26 3AA

    DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD

    7 Jan 2026 Full applications
  • 26/0241 Granted

    Liberty Steel Corporation Road Newport NP19 4XE

    ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES

    30 Mar 2026 Full applications