Skip to content
PlanIndex Get alerts
Menu

Planning application

8 Graig Park Lane Newport South Wales NP20 6GX

Granted Newport 21/0723 Full

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

ERECTION OF SINGLE STOREY AND TWO-STOREY REAR EXTENSION, HIP TO GABLE ROOF ALTERATION, LOFT CONVERSION AND WORKS TO THE GARDEN INCLUDING RETAINING WALL

As published by the council, reference 21/0723

Application record

Reference
21/0723
Type
Full
Status
Decided
Decision
Granted with Conditions
Received
7 Jul 2021
Validated
7 Jul 2021
Decided
2 Sep 2021
Ward
Malpas
Decision by
Delegated
Postcode
NP20 6GX

Timeline

Dates from the published record

  1. 7 Jul 2021

    Received by Newport

  2. 2 Sep 2021

    Decision issued: Granted with Conditions

  3. 3 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Taunton

99 applications on PlanIndex · across 16 councils · 73% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Newport

  • 26/0397 Granted

    Glen View Ponthir Road Newport South Wales NP18 3NW

    DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION

    18 May 2026 Full applications
  • 26/0368 Granted

    Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales

    PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL

    14 May 2026 Full applications
  • 26/0216 Refused

    Land Adjacent To Unit 3 Esperanto Way Newport South Wales

    PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS

    20 Mar 2026 Full applications
  • 26/0010 Granted

    The Grove Bowdens Lane Penhow Newport NP26 3AA

    DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD

    7 Jan 2026 Full applications
  • 26/0241 Granted

    Liberty Steel Corporation Road Newport NP19 4XE

    ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES

    30 Mar 2026 Full applications