Planning application
Maendy Isaf Church Road Lower Machen Newport NP10 8GW
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
PROPOSED TWO STOREY REAR EXTENSION, PORCH AND SINGLE STOREY FRONT EXTENSION AND BALCONY
As published by the council, reference 21/0227
Application record
- Reference
- 21/0227
- Type
- Full
- Status
- Decided
- Decision
- Granted with Conditions
- Received
- 2 Mar 2021
- Validated
- 4 Mar 2021
- Decided
- 19 Aug 2021
- Ward
- Graig
- Parish
- Graig Community Council
- Decision by
- Delegated
- Postcode
- NP10 8GW
Timeline
Dates from the published record
-
2 Mar 2021
Received by Newport
-
4 Mar 2021
Validated
Checked as complete and ready for consideration.
-
19 Aug 2021
Decision issued: Granted with Conditions
-
23 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a surveying firm
18 applications on PlanIndex · across 3 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Ty Gwyn Church Road Lower Machen Newport NP10 8GU
81% historically approved · decision due ~28 Sep
WORKS TO 1NO. ACER TREE (PRUNING) PROTECTED BY THE LOWER MACHEN CONSERVATION AREA
Awaiting decision Trees -
Plas Machen Caerphilly Road Newport South Wales NP10 8GX
PARTIAL DISCHARGE OF CONDITION 2 (WRITTEN SCHEME OF HISTORIC ENVIRONMENT MITIGATION) RELATING TO LISTED BUILDING CONSENT 18/0267 FOR THE REMOVAL OF EXTERNAL WC AND INTERNAL ALTERATIONS
Granted Conditions 6 docs
Other full applications applications
In Newport
-
26/0397 Granted
Glen View Ponthir Road Newport South Wales NP18 3NW
DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION
-
26/0368 Granted
Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales
PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL
-
26/0216 Refused
Land Adjacent To Unit 3 Esperanto Way Newport South Wales
PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS
-
26/0010 Granted
The Grove Bowdens Lane Penhow Newport NP26 3AA
DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD
-
26/0241 Granted
Liberty Steel Corporation Road Newport NP19 4XE
ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES