Planning application
5 Lily Way Rogerstone Newport NP10 9LG
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
RETENTION OF FRONT BOUNDARY WALL AND RAILINGS
As published by the council, reference 20/0037
Application record
- Reference
- 20/0037
- Type
- Full
- Status
- Decided
- Decision
- Granted with Conditions
- Received
- 16 Jan 2020
- Validated
- 16 Jan 2020
- Decided
- 11 Nov 2021
- Ward
- Rogerstone North
- Parish
- Rogerstone Community Council
- Decision by
- Delegated
- Postcode
- NP10 9LG
Site history
Applications at this address on the Newport register
This site has had 2 applications since 2020: 2 approved, 0 refused.
-
26/0396 Granted
5 Lily Way Rogerstone Newport NP10 9LG
CONSTRUCTION OF A SINGLE -STOREY CONSERVATORY EXTENSION TO THE EXISTING HOUSE
Timeline
Dates from the published record
-
16 Jan 2020
Received by Newport
-
11 Nov 2021
Decision issued: Granted with Conditions
-
23 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Newport
7 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Newport granted permission on 11 November 2021, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
5 Lily Way Rogerstone Newport NP10 9LG
CONSTRUCTION OF A SINGLE -STOREY CONSERVATORY EXTENSION TO THE EXISTING HOUSE
Granted Full applications Extension 22 docsSmall domestic -
2A Lily Way Rogerstone Newport NP10 9LG
LOFT CONVERSION AND REAR BOX DORMER EXTENSION
Refused Full applications Extension Loft or dormer 8 docs -
2A Lily Way Rogerstone Newport NP10 9LG
LAWFUL DEVELOPMENT CERTIFICATE FOR PROPOSED LOFT CONVERSION AND REAR DORMER EXTENSION
Refused Lawful development Extension Loft or dormer 6 docs -
3 Rivermead Way Rogerstone Newport NP10 9LT
81% historically approved · decision due ~3 Aug
PROPOSED GARAGE CONVERSION
Decided -
36 Fuscia Way Rogerstone Newport NP10 9LD
DETACHED DOUBLE GARAGE AND CONVERSION OF INTEGRATED GARAGE TO HABITABLE SPACE
Granted Full applications 7 docs -
22 Lily Way Rogerstone Newport South Wales NP10 9LG
PROPOSED SINGLE STOREY GARAGE TO SIDE OF EXISTING DWELLING
Granted Full applications 12 docsSmall domestic
Other full applications
In Newport
-
26/0397 Granted
Glen View Ponthir Road Newport South Wales NP18 3NW
DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION
-
26/0368 Granted
Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales
PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL
-
26/0216 Refused
Land Adjacent To Unit 3 Esperanto Way Newport South Wales
PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS
-
26/0010 Granted
The Grove Bowdens Lane Penhow Newport NP26 3AA
DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD
-
26/0241 Granted
Liberty Steel Corporation Road Newport NP19 4XE
ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES