Planning application
232 Corporation Road Newport NP19 0DZ
Works: Windows or glazing
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
ALTERATIONS TO SHOPFRONT AND INTERNAL RECONFIGURATIONS
As published by the council, reference 19/1067
Application record
- Reference
- 19/1067
- Type
- Full
- Status
- Decided
- Decision
- Granted with Conditions
- Received
- 23 Oct 2019
- Validated
- 23 Oct 2019
- Decided
- 5 Dec 2019
- Ward
- Victoria
- Decision by
- Delegated
- Postcode
- NP19 0DZ
Timeline
Dates from the published record
-
23 Oct 2019
Received by Newport
-
5 Dec 2019
Decision issued: Granted with Conditions
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Newport granted permission on 5 December 2019, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Part Of 264 - 272 Corporation Road Newport South Wales NP19 0DZ
81% historically approved · decision due ~7 Sep
CHANGE OF USE OF FIRST FLOOR OFFICE SPACE TO SELF CONTAINED 1 BED FLAT
Decided -
262 Corporation Road Newport NP19 0DZ
PARTIAL DISCHARGE OF CONDITIONS 2 (MATERIALS), 3 (CEMP) AND 7 (BIODIVERSITY ENHANCEMENTS) OF 23/1010 CONVERSION OF THE FIRST FLOOR FROM RETAIL INTO 4NO. 2-BEDROOM FLATS AND ASSOCIATED ALTERATIONS
Refused Conditions New dwelling 11 docs -
56 Witham Street Newport South Wales NP19 0DX
CHANGE OF USE TO 3 BEDROOM HOUSE IN MULTIPLE OCCUPATION (USE CLASS C4)
Granted Full applications 11 docs -
11 Coverack Road Newport NP19 0DS
81% historically approved · decision due ~23 Jul
PROPOSED CONVERSION OF 3 BEDROOM DWELLINGHOUSE (C3) TO 4 BEDROOM HMO (C4)
Awaiting decisionDomestic -
274 Corporation Road Newport South Wales NP19 0DZ
CHANGE OF USE FROM DWELLING TO FORM PART OF THE ADJOINING IQRA COMMUNITY CENTRE
Refused Full applications 13 docsDomestic -
Land Formerly Known As 21 Kelvedon Street Newport South Wales
PARTIAL DISCHARGE OF CONDITIONS 2 (ARBORICULTURIST), 3 (CEMP), 4 (CONTAMINATION RISK ASSESSMENT), CONDITION 5 (ENCLOSURE DETAILS), 6 (CONSTRUCTION OF PHASING), 7 (RETAINING WALL DETAILS), 8 (ULEV INFRASTRUCTURE DETAILS), 9 (CROSSOVER CLOSURE DETAILS) AND 16 (AMENITY SPACE MANAGEMENT) OF PLANNING PERMISSION 24/0756
Granted Conditions 43 docs
Other full applications
In Newport
-
26/0397 Granted
Glen View Ponthir Road Newport South Wales NP18 3NW
DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION
-
26/0368 Granted
Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales
PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL
-
26/0216 Refused
Land Adjacent To Unit 3 Esperanto Way Newport South Wales
PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS
-
26/0010 Granted
The Grove Bowdens Lane Penhow Newport NP26 3AA
DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD
-
26/0241 Granted
Liberty Steel Corporation Road Newport NP19 4XE
ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES