Planning application
277 Malpas Road Newport NP20 6WA
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
SINGLE STOREY EXTENSION TO SIDE AND REAR OF PROPERTY
As published by the council, reference 19/1027
Application record
- Reference
- 19/1027
- Type
- Full
- Status
- Decided
- Decision
- Granted with Conditions
- Received
- 10 Oct 2019
- Validated
- 10 Oct 2019
- Decided
- 28 Nov 2019
- Ward
- Malpas
- Decision by
- Delegated
- Postcode
- NP20 6WA
Timeline
Dates from the published record
-
10 Oct 2019
Received by Newport
-
28 Nov 2019
Decision issued: Granted with Conditions
-
14 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Bargoed
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
27 Blaen-Y-Pant Avenue Newport NP20 5PU
81% historically approved · decision due ~15 Oct
LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED) FOR THE CONVERSION OF ATTACHED GARAGE INCLUDING NEW ROOF
Awaiting decision Roofing -
20 Graig Park Circle Newport South Wales NP20 6HE
CONSTRUCTION OF AN OUTBUILDING IN REAR GARDEN
Granted Full applications 15 docs -
27 Blaen-Y-Pant Avenue Newport NP20 5PU
PART SINGLE STOREY PART TWO STOREY SIDE EXTENSION INCLUDING ALTERATIONS TO DRIVEWAY/PARKING (RESUBMISSION OF 21/0349)
Granted Full applications Extension 13 docsSmall domestic -
5 Hollybush Avenue Newport NP20 6ES
PARTIAL DISCHARGE OF CONDITION 02 (PRIVACY SCREEN DETAILS) AND 03 (SCHEME OF BIO DIVERSITY ENHANCEMENT) OF 23/0382 FOR DEMOLITION OF DETACHED GARAGE AND CONSTRUCTION OF SIDE EXTENSION AND DETACHED GARAGE, CLADDING OF EXISTING HOUSE AND RETENTION AND COMPLETION OF BOUNDARY WALL AND RAISED DECKING
Granted Conditions Extension Demolition 6 docsSmall domestic -
23 Hollybush Avenue Newport NP20 6ET
PROPOSED SINGLE STOREY LEAN-TO SIDE EXTENSION
Granted Full applications Extension 7 docsSmall domestic
Other full applications applications
In Newport
-
26/0397 Granted
Glen View Ponthir Road Newport South Wales NP18 3NW
DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION
-
26/0368 Granted
Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales
PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL
-
26/0216 Refused
Land Adjacent To Unit 3 Esperanto Way Newport South Wales
PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS
-
26/0010 Granted
The Grove Bowdens Lane Penhow Newport NP26 3AA
DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD
-
26/0241 Granted
Liberty Steel Corporation Road Newport NP19 4XE
ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES