72 Allt-Yr-Yn Road Newport NP20 5EF

Granted Newport 13/1110 Full Application

Works: Extension

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

ERECTION OF THREE STOREY SIDE EXTENSION AND TWO STOREY REAR EXTENSION INCLUDING PROVISION OF INTEGRAL GARAGE AND REAR RAISED PATIO AREA

As published by the council, reference 13/1110

Application record

Reference
13/1110
Type
Full Application
Status
Decided
Decision
Granted with Conditions
Received
10 Oct 2013
Validated
30 Oct 2013
Decided
5 Dec 2013
Ward
Allt-yr-Yn
Decision by
Delegated
Postcode
NP20 5EF

Timeline

Dates from the published record

  1. 10 Oct 2013

    Received by Newport

  2. 30 Oct 2013

    Validated

    Checked as complete and ready for consideration.

  3. 5 Dec 2013

    Decision issued: Granted with Conditions

  4. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 54 Allt-Yr-Yn Road Newport NP20 5EB

    26/0028 Submitted 14 Jan 2026 114m away

    PROPOSED TWO STOREY REAR EXTENSION

    Refused Full applications Extension 10 docs
  • 54 Allt-Yr-Yn Road Newport NP20 5EB

    26/0676 Submitted 1 Sep 2026 157m away

    81% historically approved · decision due ~27 Oct

    PROPOSED TWO STOREY REAR EXTENSION

    Awaiting decision Extension
  • 5 Allt-Yr-Yn View Newport NP20 5EH

    25/0676 Submitted 21 Aug 2025 161m away

    REAR SINGLE STOREY EXTENSION AND PATIO

    Granted Full applications Extension 8 docs
    Small domestic
  • 10 Mons Close Newport NP20 5ET

    20/1169 Submitted 4 Dec 2020 199m away

    PROPOSED REPLACEMENT BOUNDARY ENCLOSURE

    Withdrawn Full applications 11 docs
  • 47 Allt-Yr-Yn Avenue Newport NP20 5DB

    26/0473 Submitted 25 Jun 2026 265m away

    81% historically approved · decision due ~7 Sep

    LAWFUL DEVELOPMENT CERTIFICATE FOR A PROPOSED SINGLE STOREY REAR EXTENSION

    Decided Extension
    Small domestic
  • 81E Allt-Yr-Yn Avenue Newport NP20 5DD

    26/0612 Submitted 7 Aug 2026 302m away

    81% historically approved · decision due ~2 Oct

    PROPOSED REAR EXTERNAL STAIRCASE AND DOORWAY

    Awaiting decision

In Newport

  • 26/0397 Granted

    Glen View Ponthir Road Newport South Wales NP18 3NW

    DEMOLITION OF EXISTING GARAGE AND REAR EXTENSION AND ERECTION OF SINGLE STOREY SIDE AND REAR EXTENSION

    18 May 2026 Full applications
  • 26/0368 Granted

    Streethub Unit On Footpath Outside Monmouthshire House John Frost Square Newport South Wales

    PROPOSED INSTALLATION OF 1NO. NEW BT STREET HUB, INCORPORATING 2NO. DIGITAL 75" LCD ADVERT SCREENS, AND ASSOCIATED BT PHONE KIOSK REMOVAL

    14 May 2026 Full applications
  • 26/0216 Refused

    Land Adjacent To Unit 3 Esperanto Way Newport South Wales

    PROPOSED CHANGE OF USE FROM OFFICE (B1) TO EVENTS VENUE AND ASSOCIATED WORKS

    20 Mar 2026 Full applications
  • 26/0010 Granted

    The Grove Bowdens Lane Penhow Newport NP26 3AA

    DEMOLITION OF AN EXISTING SEMI-DETACHED DWELLING AND CONSTRUCTION OF A REPLACEMENT TWO-STOREY DETACHED DWELLING, TOGETHER WITH ASSOCIATED WORKS AND USE OF DETACHED HOLIDAY ACCOMMODATION OUTBUILDING AS PRIMARY RESIDENCE FOR DURATION OF CONSTRUCTION PERIOD

    7 Jan 2026 Full applications
  • 26/0241 Granted

    Liberty Steel Corporation Road Newport NP19 4XE

    ENGINEERING WORKS TO CONSTRUCT RAISED BUND AND ACCESS RAMP AROUND APPROVED DATA CENTRE TO A CREST OF APPROXIMATELY 9.75M AOD, PARTIAL DEMOLITION OF A BUILDING, THE IMPORTATION OF FILL MATERIAL TO CREATE THE BUND & RAMP, SURFACING WORKS AND ALTERATIONS TO BUILDING ELEVATIONS TO ACCOMMODATE LEVEL CHANGES

    30 Mar 2026 Full applications