Planning application
Plots S2 S3 S10 The International Quarter South Westfield Avenue Stratford London
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Hybrid planning permission is sought for a comprehensive, phased and residential led development at Stratford Cross for the following: (a) With all matters reserved (the Outline Element) for future determination for purpose built student accommodation ("PBSA") (Sui Generis) AND/OR large scale purpose built shared living ("LSPBSL") (sui generis); non-residential floorspace comprising Class E, F1 (b), (d) and (f), F2 and Sui Generis (public house, wine bar or drinking establishment, drinking establishment with expanded food provision, hot food takeaway, live music performance venue or cinema); areas to provide circulation, servicing, car parking and cycle parking; landscaping including laying out of open space; and other supporting infrastructure works and facilities. (b) Detailed permission (the Detailed Element) comprising: (i) residential uses (Class C3); (ii) Non-residential floorspace comprising Class E, F1 (b), (d) and (f), F2 and Sui Generis; (iii) The erection of buildings of varying heights; (iv) New vehicular access into the site from Westfield Avenue and associated highway infrastructure works, service access and car/cycle parking; (v) Hard and soft landscaping public realm works incorporating the provision of public open space; (vi) Additional areas to provide associated plant, storage, servicing, circulation space; and (vii) Associated infrastructure and ancillary works.
As published by the council, reference 26/01741/OUT
Application record
- Reference
- 26/01741/OUT
- Category
- Outline
- Status
- Registered
- Validated
- 11 Aug 2026
Timeline
Dates from the published record
-
11 Aug 2026
Validated
Checked as complete and ready for consideration.
-
18 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Newham took a median of 54 days over the applications it decided in the last year.
What happens while it is decided
This application is with Newham for determination, against a statutory target of eight weeks. Over the last year Newham's median decision took 54 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Newham
-
26/01194/SCREEN Withdrawn
Olympic Stadium Queen Elizabeth Olympic Park Stratford London E20 2ST
Request for a formal EIA Screening Opinion for proposed increase in permitted concerts from 10 to 24 events per year. A capacity of 85,000 for 8 of those 24 events and 80,000 for the remainder (16 events). All events to be at a maximum of 75 decibels (using the current definition of not more than 75 dB(A) 15mins Leq measured 1m from the façade of sensitive receptors) The ability to have 4 consecutive nights of concerts.The regularising of the 62,500 capacity for all sports events (currently capped at 60,000 except for West Ham football matches); and Reduced annual frequency of sports events from 87 to 70.
-
26/01384/OUT Awaiting decision
Former East Ham Gasworks Southend Road East Ham London E6 2AA
Outline planning permission with all matters reserved for the comprehensive phased redevelopment to provide new buildings to accommodate new homes (Class C3), flexible commercial, sport and community uses (Class E, F2 and Sui Generis - drinking establishment), associated cycle and vehicle parking, landscaping, public realm, open space, children's play space, sports pitches, partial removal of subterranean elements of the former gasholder, full remediation and site preparation works. THIS APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL STATEMENT UNDER THE TOWN AND COUNTRY PLANNING (ENVIRONMENTAL IMPACT ASSESSMENT) REGULATIONS 2017 (AS AMENDED).
-
26/01035/SCREEN Withdrawn
2 Bridge Terrace Stratford London E15 3FF
Request for a formal EIA Screening Opinion for proposed residential development of up to 179 homes.
-
26/00052/SCOPE Withdrawn
Land At Cherry Park Lane And Westfield Avenue And Montfichet Road Stratford London E20 1NT
Request for a Scoping Opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) with respect to the redevelopment of part of Stratford Cross, comprising Plots S2 - Co-living and Purpose-Built Student Accommodation, up to approximately 1,500 beds, Up to 1,340 sqm of Class E, F1, F2 and Sui Generis floorspace - including residential amenity floorspace. Plots S3 and S10 - Residential Use (Class C) approximately 820 units, including residential amenity floorspace, Up to 1,500 sqm of Class E, F1, F2 and Sui Generis floorspace.
-
26/00394/SCOPE Status unknown
Gas Holder East Ham Sports Ground Southend Road East Ham London E6 2AA
Request for a Scoping Opinion in accordance with Regulation 15 of the Town and Country Planning (Environmental Impact Assessment)(England) Regulations 2017 (as amended), in respect of the former East Ham Gasworks, Newham.