Skip to content
PlanIndex Get alerts
Menu

Planning application

Silvertown Tunnel Site Dock Road Silvertown London

Granted Newham 22/01335/AOD Approval of Details

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Approval of details pursuant to Paragraph 8 of Schedule 2 (Surface Water Drainage) attached to the Silvertown Tunnel Order 2018 came into force on 31st May 2018.

As published by the council, reference 22/01335/AOD

Application record

Reference
22/01335/AOD
Type
Approval of Details
Status
Permitted
Decision
Granted As published: Approve
Received
6 Jun 2022
Validated
6 Jun 2022
Decided
27 Jan 2023
Ward
Royal Victoria
Parish
Custom House And Canning Community Forum
Decision by
Delegated decision

Site history

Applications at this address on the Newham register

This site has had 6 applications since 2021: 6 approved, 0 refused.

  • 23/00694/AOD Granted

    Silvertown Tunnel Site Dock Road Silvertown London

    Approval of details pursuant to partial discharge of Requirement 9 (External Lighting Details) attached to the Silvertown Tunnel Order 2018 came into force on 31st May 2018, in relation to the North Portal Tunnel Services Building (Work No. 17 (a) in Schedule 1 of the Order)

    Decided 15 May 2023 Conditions
  • 23/00137/AOD Granted

    Silvertown Tunnel Site Dock Road Silvertown London

    Approval of details pursuant to Requirement 5 (3) (e) (Construction Traffic Management Plan) attached to the Silvertown Tunnel Order 2018 came into force on 31st May 2018.

    Decided 17 Mar 2023 Conditions
  • 23/00281/AOD Granted

    Silvertown Tunnel Site Dock Road Silvertown London

    Approval of details pursuant to Paragraph 4 (Detailed design of above ground buildings and structures) of Schedule 2, in relation to Work 17(a) (the construction of tunnel services buildings), attached to the Silvertown Tunnel Order 2018 came into force on 31st May 2018.

    Decided 15 Mar 2023 Conditions
  • 22/02842/AOD Granted

    Silvertown Tunnel Site Dock Road Silvertown London

    Approval of details pursuant to Paragraph 4 (Detailed design of above ground buildings and structures) of Schedule 2, in relation to Work 15(c) (External appearance of the retaining walls) and Work No.15d (external appearance of an anti-recirculation wall at the North portal), excluding public art element on the noise barriers, attached to the Silvertown Tunnel Order 2018 came into force on 31st May 2018.

    Decided 21 Feb 2023 Conditions
  • 21/01550/AOD Granted

    Silvertown Tunnel Site Dock Road Silvertown London

    Approval of details pursuant to Requirement 8 (Surface Water Drainage Details) attached to the Silvertown Tunnel Order 2018 came into force on 31st May 2018, in relation to temporary surface water drainage

    Decided 11 Aug 2021 Conditions

Timeline

Dates from the published record

  1. 6 Jun 2022

    Received by Newham

  2. 27 Jan 2023

    Decision issued: Approve

  3. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Newham granted permission on 27 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Newham

  • 26/01876/AOD Status unknown

    Pontoon Dock DLR Station North Woolwich Road Silvertown London E16 2AA

    Approval of details pursuant to Condition 6 (External Materials and Detailed Design) attached to Planning Consent 24/00671/FUL dated 21st August 2024.

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • 26/01880/AOD Status unknown

    The International Quarter South Westfield Avenue Stratford London

    Approval of details pursuant to Condition 23 (Materials) for Parts B, I, J and K relating to the glazed bricks and unitised façade of Building S1 attached to Planning Consent 21/00416/FUL (LLDC) dated 16th November 2023)

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • 26/01872/AOD Status unknown

    Development Site For Twelvetrees Park Stephenson Street Canning Town London E16 4SB

    Approval of details pursuant to Condition C47 (Construction Methodology Statement) and Condition C58 (Instrument Flight Procedures Impact) attached to Planning Consent 24/01731/VAR dated 17th April 2024.

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • 26/01829/AOD Status unknown

    1 Washington Road East Ham London E6 1AJ

    Approval of details pursuant to Condition 9 (Highways Works) attached to Planning Consent 24/01483/OUT dated 27th February 2025.

    Received 20 Aug, published by the council 21 Aug 2026 Conditions
  • 26/01831/AOD Status unknown

    14 Marshgate Lane Stratford London E15 2NH

    Approval of details pursuant to Condition 25 (Material Samples and Detailed Design) attached to Planning Consent 23/00305/FUL (LLDC) dated 06th September 2024.

    Received 19 Aug, published by the council 24 Aug 2026 Conditions