Skip to content
PlanIndex Get alerts
Menu

Planning application

Former Beckton Gasworks And Adjoining Land Armada Way Beckton London E6 7FB

Withdrawn Newham 21/01896/S106 Discharge or Modify S106 Obligation

Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.

Proposal

Submission of annual report and details pursuant to paragraph 1.6.1 (Bioliquid Annual Profiling Report) and paragraphs 2.1 and 2.2 (Bioliquid Technology Presentation) of Schedule 1 of Section 106 Agreement dated 12th January 2009 (reference 08/00460/LTGDC) further amended by Deed of Variation dated 23rd February 2015 (reference 14/02743/VARDWG).

As published by the council, reference 21/01896/S106

Application record

Reference
21/01896/S106
Type
Discharge or Modify S106 Obligation
Status
Withdrawn
Decision
Response Issued/Case Closed
Received
2 Aug 2021
Validated
2 Aug 2021
Decided
5 Aug 2021
Ward
Beckton
Parish
Beckton Community Forum
Postcode
E6 7FB

Site history

Applications at this address on the Newham register

This site has had 3 applications since 2021.

  • 26/01906/S106 Decided

    Former Beckton Gasworks And Adjoining Land Armada Way Beckton London E6 7FB

    Submission of annual report (2026) and details pursuant to paragraph 1.6.1 (Bioliquid Annual Profiling Report) and paragraphs 2.1 and 2.2 (Bioliquid Technology Presentation) of Schedule 1 of Deed of Planning obligations dated 12th January 2009 (reference 08/00460/LTGDC) further amended by Deed of Variation dated 23rd February 2015 (reference 14/02743/VARDWG).

    Decided 4 Sep 2026
  • 23/01585/S106 Withdrawn

    Former Beckton Gasworks And Adjoining Land Armada Way Beckton London E6 7FB

    Submission of annual report (2023) and details pursuant to paragraph 1.6.1 (Bioliquid Annual Profiling Report) and paragraphs 2.1 and 2.2 (Bioliquid Technology Presentation) of Schedule 1 of Deed of Planning obligations dated 12th January 2009 (reference 08/00460/LTGDC) further amended by Deed of Variation dated 23rd February 2015 (reference 14/02743/VARDWG).

    Decided 7 Aug 2023 Conditions

Timeline

Dates from the published record

  1. 2 Aug 2021

    Received by Newham

  2. 5 Aug 2021

    Decision issued: Response Issued/Case Closed

  3. 29 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What withdrawal means

The applicant withdrew this application before Newham decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Former Beckton Gasworks And Adjoining Land Armada Way Beckton London E6 7FB

    23/01585/S106 Submitted 5 Jul 2023 50 yards away

    Submission of annual report (2023) and details pursuant to paragraph 1.6.1 (Bioliquid Annual Profiling Report) and paragraphs 2.1 and 2.2 (Bioliquid Technology Presentation) of Schedule 1 of Deed of Planning obligations dated 12th January 2009 (reference 08/00460/LTGDC) further amended by Deed of Variation dated 23rd February 2015 (reference 14/02743/VARDWG).

    Withdrawn Conditions 5 docs
  • Royal Quays Armada Way Gallions Reach Beckton London E6 7FB

    05/00065/FUL Submitted 26 Sep 2005 50 yards away

    Amendments to previously approved planning consent no. P/01/1536 dated 19/12/01 as amended by consent no. P/03/1830 dated 10/9/04 to include 1 additional residential unit making 447 units in total, amendment of building levels and roof design.

    Withdrawn Full applications
    Major scheme
  • Telecommunication Site 265992 Armada Way Beckton London E6 7FB

    23/00138/TEL Submitted 18 Jan 2023 50 yards away

    The Proposed installation comprises of the replacement of 3 antennas with 6 new antennas and ancillary development.

    Granted Telecoms
  • Depot DLR Armada Way Beckton London E6 7FB

    26/01848/AOD Submitted 7 Oct 2026 50 yards away

    85% historically approved · decision due ~2 Dec

    Approval of details pursuant to Condition 9 (Hard Landscaping), Condition 11 (Details of Boundary Treatment) and Condition 13 (Delivery and Servicing Plan (DSP)) attached to Planning Consent 22/01211/FUL dated 28th October 2022.

    Awaiting decision
  • Former Beckton Gasworks And Adjoining Land Armada Way Beckton London E6 7FB

    26/01906/S106 Submitted 2 Sep 2026 50 yards away

    Submission of annual report (2026) and details pursuant to paragraph 1.6.1 (Bioliquid Annual Profiling Report) and paragraphs 2.1 and 2.2 (Bioliquid Technology Presentation) of Schedule 1 of Deed of Planning obligations dated 12th January 2009 (reference 08/00460/LTGDC) further amended by Deed of Variation dated 23rd February 2015 (reference 14/02743/VARDWG).

    Decided
  • Depot DLR Armada Way Beckton London E6 7FB

    26/01716/CLP Submitted 31 Jul 2026 100 yards away

    76% historically approved · decision due ~25 Sep

    Application for a lawful development certificate (proposed) for erection of substation building and associated works.

    Status unknown Lawful development 4 docs

In Newham

  • 26/01876/AOD Status unknown

    Pontoon Dock DLR Station North Woolwich Road Silvertown London E16 2AA

    Approval of details pursuant to Condition 6 (External Materials and Detailed Design) attached to Planning Consent 24/00671/FUL dated 21st August 2024.

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • 26/01880/AOD Status unknown

    The International Quarter South Westfield Avenue Stratford London

    Approval of details pursuant to Condition 23 (Materials) for Parts B, I, J and K relating to the glazed bricks and unitised façade of Building S1 attached to Planning Consent 21/00416/FUL (LLDC) dated 16th November 2023)

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • 26/01872/AOD Status unknown

    Development Site For Twelvetrees Park Stephenson Street Canning Town London E16 4SB

    Approval of details pursuant to Condition C47 (Construction Methodology Statement) and Condition C58 (Instrument Flight Procedures Impact) attached to Planning Consent 24/01731/VAR dated 17th April 2024.

    Received 27 Aug, published by the council 2 Sep 2026 Conditions
  • 26/01829/AOD Status unknown

    1 Washington Road East Ham London E6 1AJ

    Approval of details pursuant to Condition 9 (Highways Works) attached to Planning Consent 24/01483/OUT dated 27th February 2025.

    Received 20 Aug, published by the council 21 Aug 2026 Conditions
  • 26/01831/AOD Status unknown

    14 Marshgate Lane Stratford London E15 2NH

    Approval of details pursuant to Condition 25 (Material Samples and Detailed Design) attached to Planning Consent 23/00305/FUL (LLDC) dated 06th September 2024.

    Received 19 Aug, published by the council 24 Aug 2026 Conditions