Planning application
West Ham Sub Station Bidder Street Canning Town London E16 4ST
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of two deep bored cable tunnels with dimensions of approximately 6km long, an internal diameter of 2.82m and external diameter of 3.18m respect of the East Tunnel and approximately 6km long, an internal diameter of 4.15m and external diameter of 4.55m in respect of the West Tunnel and at a general depth varying along their respective routes between approximately 14 metres and 34 metres and more particularly described in the application drawings and running from South Crescent, West Ham and West Ham EDFE Substation at Bidder Street to the Hackney NGT Substation and the EDFE Substation at Lea Bridge in Hackney together with, at surface level, 7 maintenance and ventilation shafts, including related connection and ventilation tunnels and cable connection riser and 4 single storey above ground head house structures in respect of the proposed shafts at South Crescent, West Ham, at the EDFE Substation at Millfields Road, Hackney, and at the West Ham Substation at Bidder Street, Newham, including associated parking, means of enclosure and all site preparation remediation works at the shaft locations, temporary deposition of uncontaminated spoil at the former Hackney Stadium and on part of the Carpenters Road Site; enabling and engineering works; to enable the decommissioning and removal of the overhead powerlines between West Ham Substation and Hackney Wick Substation in the Lower Lea Valley.
As published by the council, reference 05/00413/FUL
Application record
- Reference
- 05/00413/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Granted As published: Approve
- Received
- 27 Oct 2005
- Validated
- 27 Oct 2005
- Decided
- 6 Jan 2006
- Ward
- Canning Town North
- Parish
- Custom House And Canning Community Forum
- Decision by
- Committee decision
- Postcode
- E16 4ST
Site history
Applications at this address on the Newham register
This site has had 2 applications since 2005: 2 approved, 0 refused.
-
05/0824 Granted
West Ham Sub Station Bidder Street Canning Town London E16 4ST
Permission Is Sought For The Construction Of Two Deep Bored Cable Tunnels With Dimensions Of Approximately 6km Long, An Internal Diameter Of 3.70m And External Diameter Of 4.2m Respect Of The East Tunnel And Approximately 6km Long, An Internal Diameter Of 4.00m And External Diameter Of 4.30m In Respect Of The West Tunnel And At A General Depth Varying Along Their Respective Routes Between Approximately 14 Metres And 34 Metres And More Particularly Described In The Application Drawings And Running From South Crescent, West Ham And West Ham Edfe Substation At Bidder Street To The Hackney Ngt Substation And The Edfe Substation At Lea Bridge In Hackney Together With, At Surface Level, 7 Maintenance And Ventilation Shafts, Including Related Connection And Ventilation Tunnels And 2 Single Storey Above Ground Head House Structures In Respect Of The Proposed Shafts At South Crescent, West Ham, And At The Edfe Substation At Millfields Road, Hackney, Including Associated Parking, Means Of Enclosure And All Site Preparation Remediation Works At The Shaft Locations, Temporary Deposition Of Uncontaminated Spoil At The Former Hackney Stadium; Enabling And Engineering Works; To Enable The Decommissioning And Removal Of The Overhead Powerlines Between West Ham Substation And Hackney Wick Substation In The Lower Lea Valley.
Timeline
Dates from the published record
-
27 Oct 2005
Received by Newham
-
6 Jan 2006
Decision issued: Approve
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Newham granted permission on 6 January 2006, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
West Ham Sub Station Bidder Street Canning Town London E16 4ST
Permission Is Sought For The Construction Of Two Deep Bored Cable Tunnels With Dimensions Of Approximately 6km Long, An Internal Diameter Of 3.70m And External Diameter Of 4.2m Respect Of The East Tunnel And Approximately 6km Long, An Internal Diameter Of 4.00m And External Diameter Of 4.30m In Respect Of The West Tunnel And At A General Depth Varying Along Their Respective Routes Between Approximately 14 Metres And 34 Metres And More Particularly Described In The Application Drawings And Running From South Crescent, West Ham And West Ham Edfe Substation At Bidder Street To The Hackney Ngt Substation And The Edfe Substation At Lea Bridge In Hackney Together With, At Surface Level, 7 Maintenance And Ventilation Shafts, Including Related Connection And Ventilation Tunnels And 2 Single Storey Above Ground Head House Structures In Respect Of The Proposed Shafts At South Crescent, West Ham, And At The Edfe Substation At Millfields Road, Hackney, Including Associated Parking, Means Of Enclosure And All Site Preparation Remediation Works At The Shaft Locations, Temporary Deposition Of Uncontaminated Spoil At The Former Hackney Stadium; Enabling And Engineering Works; To Enable The Decommissioning And Removal Of The Overhead Powerlines Between West Ham Substation And Hackney Wick Substation In The Lower Lea Valley.
Granted Other 4 docsSmall domestic -
Crown And Mayer Parry Wharf Bidder Street Canning Town London E16 4ST
Non-material amendment to the Planning Permission 23/00655/FUL dated on 5th September 2024, comprising the amendments to description of development to include two additional storeys to Blocks B3 and B2 and provision of a total of 873 dwellings (Use Class C3) and 2,635sqm (GIA) employment space (Use Class E) across the site; affordable housing tenure; and wording of condition 2 (approved plans) to allow the substitution of plans reflecting the reconfiguration of residential and commercial floorspace
Granted Amendments 40 docsMajor scheme -
Crown And Mayer Parry Wharf Bidder Street Canning Town London E16 4ST
99% historically approved · decision due ~6 Oct
Approval of details pursuant to Condition 6 (Construction Management and Logistics Plan (CMLP)) attached to Planning Consent 23/00655/FUL dated 05th September 2024.
Status unknown Conditions 4 docs -
Crown And Mayer Parry Wharf Bidder Street Canning Town London E16 4ST
Approval of details pursuant to Condition 16 (Children's Play Space Details) in relation to Phase 1 attached to Planning Consent 23/00655/FUL dated 05th September 2024.
Withdrawn Conditions 8 docs -
Bidder Street, "electra" Unit 3, Canning Town London, E16 4st
69% historically approved · decision due ~4 Nov
New Mezzanine To Existing Warehouse At Unit 3
Status unknown Full applications 6 docs -
Land At Former EMR Site Bidder Street Canning Town London E16 4ST
99% historically approved · decision due ~10 Oct
Approval of details pursuant to Condition 8 (Submission of a Bird Hazard Management Plan - London City Airport) attached to Planning Consent 24/00088/FUL dated 14th April 2025.
Status unknown Conditions 3 docs
Other full applications
In Newham
-
26/02030/FUL Awaiting decision
67 Park Avenue East Ham London E6 2PY
Change of use to HMO (Use Class C4) with associated waste/cycle storage.
-
26/01950/FUL Awaiting decision
52 Caistor Park Road Stratford London E15 3PS
(Retrospective) Change of use to supported living accommodation (Use Class C3(b))
-
26/00749/FUL Awaiting decision
26B Station Road Manor Park London E12 5BT
(Retrospective) Change of use to self-contained studio (Use Class C3).
-
26/01889/FUL Awaiting decision
1 Jack Cornwell Street Manor Park London E12 5NN
Change of use of existing ground floor commercial unit from Sui Generis (formerly Use Class A4 - Public House) to Use Class E(a) for the display or retail sale of goods.
-
26/02119/FUL Awaiting decision
68 - 82 Shaftesbury Road Forest Gate London E7 8PD
Replacement of uPVC windows and timber balcony/garden doors with uPVC windows and doors.