West Ham Sub Station Bidder Street Canning Town London E16 4ST

Granted Newham 05/00413/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Construction of two deep bored cable tunnels with dimensions of approximately 6km long, an internal diameter of 2.82m and external diameter of 3.18m respect of the East Tunnel and approximately 6km long, an internal diameter of 4.15m and external diameter of 4.55m in respect of the West Tunnel and at a general depth varying along their respective routes between approximately 14 metres and 34 metres and more particularly described in the application drawings and running from South Crescent, West Ham and West Ham EDFE Substation at Bidder Street to the Hackney NGT Substation and the EDFE Substation at Lea Bridge in Hackney together with, at surface level, 7 maintenance and ventilation shafts, including related connection and ventilation tunnels and cable connection riser and 4 single storey above ground head house structures in respect of the proposed shafts at South Crescent, West Ham, at the EDFE Substation at Millfields Road, Hackney, and at the West Ham Substation at Bidder Street, Newham, including associated parking, means of enclosure and all site preparation remediation works at the shaft locations, temporary deposition of uncontaminated spoil at the former Hackney Stadium and on part of the Carpenters Road Site; enabling and engineering works; to enable the decommissioning and removal of the overhead powerlines between West Ham Substation and Hackney Wick Substation in the Lower Lea Valley.

As published by the council, reference 05/00413/FUL

Application record

Reference
05/00413/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Approve
Received
27 Oct 2005
Validated
27 Oct 2005
Decided
6 Jan 2006
Ward
Canning Town North
Parish
Custom House And Canning Community Forum
Decision by
Committee decision
Postcode
E16 4ST

Timeline

Dates from the published record

  1. 27 Oct 2005

    Received by Newham

  2. 6 Jan 2006

    Decision issued: Approve

  3. 25 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • West Ham Sub Station Bidder Street Canning Town London E16 4ST

    05/0824 Submitted 3 Jun 2005 0m away

    Permission Is Sought For The Construction Of Two Deep Bored Cable Tunnels With Dimensions Of Approximately 6km Long, An Internal Diameter Of 3.70m And External Diameter Of 4.2m Respect Of The East Tunnel And Approximately 6km Long, An Internal Diameter Of 4.00m And External Diameter Of 4.30m In Respect Of The West Tunnel And At A General Depth Varying Along Their Respective Routes Between Approximately 14 Metres And 34 Metres And More Particularly Described In The Application Drawings And Running From South Crescent, West Ham And West Ham Edfe Substation At Bidder Street To The Hackney Ngt Substation And The Edfe Substation At Lea Bridge In Hackney Together With, At Surface Level, 7 Maintenance And Ventilation Shafts, Including Related Connection And Ventilation Tunnels And 2 Single Storey Above Ground Head House Structures In Respect Of The Proposed Shafts At South Crescent, West Ham, And At The Edfe Substation At Millfields Road, Hackney, Including Associated Parking, Means Of Enclosure And All Site Preparation Remediation Works At The Shaft Locations, Temporary Deposition Of Uncontaminated Spoil At The Former Hackney Stadium; Enabling And Engineering Works; To Enable The Decommissioning And Removal Of The Overhead Powerlines Between West Ham Substation And Hackney Wick Substation In The Lower Lea Valley.

    Granted Other 4 docs
    Small domestic
  • Crown And Mayer Parry Wharf Bidder Street Canning Town London E16 4ST

    25/02737/NONMAT Submitted 15 Dec 2025 0m away

    Non-material amendment to the Planning Permission 23/00655/FUL dated on 5th September 2024, comprising the amendments to description of development to include two additional storeys to Blocks B3 and B2 and provision of a total of 873 dwellings (Use Class C3) and 2,635sqm (GIA) employment space (Use Class E) across the site; affordable housing tenure; and wording of condition 2 (approved plans) to allow the substitution of plans reflecting the reconfiguration of residential and commercial floorspace

    Granted Amendments 40 docs
    Major scheme
  • Crown And Mayer Parry Wharf Bidder Street Canning Town London E16 4ST

    25/01760/AOD Submitted 11 Aug 2025 0m away

    99% historically approved · decision due ~6 Oct

    Approval of details pursuant to Condition 6 (Construction Management and Logistics Plan (CMLP)) attached to Planning Consent 23/00655/FUL dated 05th September 2024.

    Status unknown Conditions 4 docs
  • Crown And Mayer Parry Wharf Bidder Street Canning Town London E16 4ST

    26/00010/AOD Submitted 20 Jan 2026 0m away

    Approval of details pursuant to Condition 16 (Children's Play Space Details) in relation to Phase 1 attached to Planning Consent 23/00655/FUL dated 05th September 2024.

    Withdrawn Conditions 8 docs
  • Bidder Street, "electra" Unit 3, Canning Town London, E16 4st

    04/1251 Submitted 9 Sep 2004 0m away

    70% historically approved · decision due ~4 Nov

    New Mezzanine To Existing Warehouse At Unit 3

    Status unknown Full applications 6 docs
  • Land At Former EMR Site Bidder Street Canning Town London E16 4ST

    25/01780/AOD Submitted 15 Aug 2025 0m away

    99% historically approved · decision due ~10 Oct

    Approval of details pursuant to Condition 8 (Submission of a Bird Hazard Management Plan - London City Airport) attached to Planning Consent 24/00088/FUL dated 14th April 2025.

    Status unknown Conditions 3 docs

In Newham

  • 26/01647/FUL Awaiting decision

    Vicarage Lane Health Centre 10 Vicarage Lane Stratford London E15 4ES

    Installation of a roof-mounted air handling unit and associated works.

    Full applications
  • 26/00008/FUL Refused

    117 - 125 Freemasons Road Canning Town London E16 3PH

    Temporary use of the site as a hand car wash and car tyre service station (Sui Generis) for a 6-year period.

    5 Jan 2026 Full applications
  • 26/00388/FUL Granted

    164 - 168 Barking Road Canning Town London E16 1EN

    Installation of two rapid electric vehicle charging stations and ancillary equipment within the car park of McDonald's, E16.

    4 Mar 2026 Full applications
  • 26/01866/FUL Awaiting decision

    Land Rear Of 207 To 209 Lonsdale Avenue East Ham London E6 3PZ

    Demolition of existing residential garage block and erection of single storey 2-bedroom dwelling (Use Class C3) with associated cycle/refuse storage.

    Full applications
  • 26/00731/FUL Granted

    28 Knox Road Forest Gate London E7 9HW

    Demolition of the existing outrigger and erection of a single-storey rear extension, with a part-retrospective application for an outbuilding. (amended description)