Skip to content
PlanIndex Get alerts
Menu

Planning application

2026/0101/01/NPA

104 Holly Avenue, Jesmond, Newcastle Upon Tyne, NE2 2QB

Granted Newcastle upon Tyne Prior Notification - Larger Home Extension

Proposal

Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 3 metres, maximum height of extension 3 metres, total projection from rear wall of original house 5.96 metres

As published by the council, reference 2026/0101/01/NPA

Timeline

Dates from the published record

  1. 19 Jan 2026

    Received by Newcastle upon Tyne

  2. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 8 Gowan Terrace, Newcastle Upon Tyne, NE2 2PS

    TPO Application: Lime (T1 on Sketch Plan) - Take off epicormic growth on main trunk, raising crown to previous point of 5m from ground level, reduce crown to previous pollard points 2-3m. (TPO 1989/011)

    12 Dec 2025 51m away Trees
  • Pavilion Mews, 2a Gowan Terrace, Newcastle Upon Tyne, NE2 2PS

    TPO Application: Sycamore (T25 on Sketch Plan) - Reduce the side of the tree crown close to the buildings by 1.0m to 1.80m, Reduce remainder of crown by 1.0 to 1.3 meters, Thin the crown by 10% (TPO 1968/006)

    16 Jan 2026 51m away Trees
  • 5 Manor House Road, Newcastle Upon Tyne, NE2 2LU

    Lawful Development Certificate for existing use as 8 bedroom HMO (Sui Generis).

    29 Jan 2026 76m away Lawful development
  • 14 Manor House Road, Newcastle Upon Tyne, NE2 2LU

    Lawful Development Certificate for existing 8 bed HMO (Sui Generis)

    18 Feb 2026 76m away Lawful development
  • 41 Holly Avenue, Jesmond, Newcastle Upon Tyne, NE2 2PX

    TPO Application: Lime - prune branches as per annotated images supplied in application (TPO 2020/002.T13)

    13 Jan 2026 133m away Trees
  • 2026/0070/01/TPO Status unknown

    Newcastle Cricket Club, Newcastle Cricket Club Osborne Avenue, Newcastle Upon Tyne, NE2 1JS

    TPO Application: Lime (T1 on Sketch Plan) - Crown lift of lower canopy to 6m, Crown thin of 15%, Lime (T2 on Sketch Plan) - Crown lift of lower canopy to 6m, Crown thin of 15%, Lime (T3 on Sketch Plan) - Crown lift of lower canopy to 6m, Crown thin of 15%, Lime (T4 on Sketch Plan) - Crown lift of lower canopy to 6m, Crown thin of 15%, Lime (T5 on Sketch Plan) - Crown lift of lower canopy to 6m, Crown thin of 15%, Black Poplar (T6 on Sketch Plan) - Crown lift of lower canopy to 6m, Crown thin of 15%. TPO (1968/006)

    13 Jan 2026 138m away Trees

In Newcastle upon Tyne

  • 2026/1049/01/NPA Status unknown

    32 Roeburn Way, Newcastle Upon Tyne, NE3 4QA

    Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 2.25 metres, maximum height of extension 3.40 metres, total projection from rear wall of original house 4.50 metres.

    26 Jun 2026 Prior approval
  • 2026/0925/01/NPA Status unknown

    20 Hedley Street, Gosforth, Newcastle Upon Tyne, NE3 1DL

    Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 2.83 metres, maximum height of extension 2.95 metres, total projection from rear wall of original house 4.97 metres.

    4 Jun 2026 Prior approval
  • 2026/0760/01/NPA Status unknown

    12 Gibside Gardens, Newcastle Upon Tyne, NE15 7PP

    Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 3 metres, maximum height of extension 3 metres, total projection from rear wall of original house 5 metres.

    5 May 2026 Prior approval
  • 8 Birkdale Close, Newcastle Upon Tyne, NE7 7TP

    Notification for Prior Approval: Erection of single storey extension to rear, height to eaves 2.80 metres, maximum height of extension 2.90 metres, total projection from rear wall of original house 4.60 metres.

    15 Apr 2026 Prior approval
  • 30 Chatton Wynd, Gosforth, Newcastle Upon Tyne, NE3 2ND

    Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 3 metres, maximum height of extension 3.2 metres, total projection from rear wall of original house 5.2 metres

    7 Apr 2026 Prior approval