Skip to content
PlanIndex Get alerts
Menu

Planning application

2025/2046/01/NPA

7 Springbank Road, Newcastle Upon Tyne, NE2 1PD

Granted Newcastle upon Tyne Prior Notification - Larger Home Extension

Proposal

Notification for Prior Approval: Erection of single storey extension to rear, height to eaves 2.49 metres, maximum height of extension 3.67 metres, total projection from rear wall of original house 3.13 metres.

As published by the council, reference 2025/2046/01/NPA

Timeline

Dates from the published record

  1. 19 Dec 2025

    Received by Newcastle upon Tyne

  2. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 7 Springbank Road, Newcastle Upon Tyne, NE2 1PD

    Lawful Development Certificate for proposed change of use from HMO (Use Class C4) to dwelling House (Use Class C3), proposed loft conversion with installation of 3no. rooflights to front and erection of dormer extension to rear.

    19 Dec 2025 0m away Lawful development
  • 2026/0811/01/LDC Status unknown

    18 Greystoke Avenue, Newcastle Upon Tyne, NE2 1PN

    Lawful Development Certificate for existing use as a 4 bed HMO (Class C4)

    13 May 2026 62m away Lawful development
  • 2026/0349/01/DET Status unknown

    Sinfonia House, 41 Jesmond Vale, Sandyford, Newcastle Upon Tyne, NE2 1PG

    Demolition of building.

    23 Feb 2026 129m away Full applications
  • WORTHINGTON COURT Saint Catherines Grove, Newcastle Upon Tyne, NE2 1LF

    TPO Application: Sycamore (G1 on Sketch Plan) - . a crown lift to 2.5 metres only where required, along with a lower canopy lateral reduction of 1.5 metres only where required, deadwood Oak (T1 on Sketch Plan) - 2 meter reduction and Crown clean, Sycamore (T2 on Sketch Plan) sever Ivy - crown lift 3 meters, Cherry (T3 on Sketch Plan) - 1.5 meter Reduction - crown clean and lift 2.5 meters, Cherry (T4 on Sketch Plan) - 2 meter Reduction Crown clean and crown lift 2.5 meters, Plum (G2 on Sketch Plan) - Removal of dead wood where possible and fell, Shrub area mixed species (G3 on Sketch Plan) – remove, Cherry (T5 on Sketch Plan) - 1.5 meter Reduction crown lift 2.5 meter - crown clean. (TPO 1994/001 / 1984/011) amended email 05/01/2026

    5 Nov 2025 207m away Trees
  • WORTHINGTON COURT Saint Catherines Grove, Newcastle Upon Tyne, NE2 1LF

    TPO Application: 2no. Sycamores crown lift by 4 metres or up to crown break by removing epicormic growth. (TPO 1984/011)

    27 Jan 2026 207m away Trees
  • 183 Dinsdale Road, Newcastle Upon Tyne, NE2 1DP

    Lawful Development Certificate for proposed conversion of an existing hipped roof to provide a gable and the addition of a box dormer to the rear roof slope.

    14 Aug 2025 211m away Lawful development

In Newcastle upon Tyne

  • 2026/1049/01/NPA Status unknown

    32 Roeburn Way, Newcastle Upon Tyne, NE3 4QA

    Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 2.25 metres, maximum height of extension 3.40 metres, total projection from rear wall of original house 4.50 metres.

    26 Jun 2026 Prior approval
  • 2026/0925/01/NPA Status unknown

    20 Hedley Street, Gosforth, Newcastle Upon Tyne, NE3 1DL

    Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 2.83 metres, maximum height of extension 2.95 metres, total projection from rear wall of original house 4.97 metres.

    4 Jun 2026 Prior approval
  • 2026/0760/01/NPA Status unknown

    12 Gibside Gardens, Newcastle Upon Tyne, NE15 7PP

    Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 3 metres, maximum height of extension 3 metres, total projection from rear wall of original house 5 metres.

    5 May 2026 Prior approval
  • 8 Birkdale Close, Newcastle Upon Tyne, NE7 7TP

    Notification for Prior Approval: Erection of single storey extension to rear, height to eaves 2.80 metres, maximum height of extension 2.90 metres, total projection from rear wall of original house 4.60 metres.

    15 Apr 2026 Prior approval
  • 30 Chatton Wynd, Gosforth, Newcastle Upon Tyne, NE3 2ND

    Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 3 metres, maximum height of extension 3.2 metres, total projection from rear wall of original house 5.2 metres

    7 Apr 2026 Prior approval