Planning application
2025/1980/01/NPA
48 Rothbury Terrace, Newcastle Upon Tyne, NE6 5XJ
Proposal
Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 2.87 metres, maximum height of extension 3.58 metres, total projection from rear wall of original house 5.23 metres.
As published by the council, reference 2025/1980/01/NPA
Timeline
Dates from the published record
-
9 Dec 2025
Received by Newcastle upon Tyne
-
20 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
2026/0469/01/DET Status unknown
Motorvation, 10b Rothbury Terrace, Heaton, Newcastle Upon Tyne, NE6 5XH
Change of use from commercial (Class E) to community facility (Sui Generis) including alterations to elevations, gable dormer extension and green roof.
-
2026/0967/01/DET Status unknown
The Naked Deli, 231 Chillingham Road, Newcastle Upon Tyne, NE6 5LJ
Change of use of first and second floor from Class E(b) to a three-bedroom HMO (Class C4) Installation of external staircase and access gates to rear.
-
2025/1867/01/DET Status unknown
226 Chillingham Road, Newcastle Upon Tyne, NE6 5LP
Change of use of first floor from commercial storage space (Class E) to 2no. 1 bedroomed residential apartments (Class C3) and installation of new windows to first floor elevations.
-
2026/0726/01/DET Status unknown
4 Meldon Terrace, Heaton, Newcastle Upon Tyne, NE6 5XP
Change of use from 7-bedroom HMO (Sui Generis) to 4no. 1 bedroom flats (Class C3).
-
2026/0341/01/HOU Status unknown
16 Trewhitt Road, Newcastle Upon Tyne, NE6 5LT
Erection of single storey extension to rear and alterations to elevations
-
2026/0871/01/DET Status unknown
38 King John Terrace, Newcastle Upon Tyne, NE6 5XY
Loft conversion with rooflights to front and rear.
Other prior approval applications
In Newcastle upon Tyne
-
2026/1049/01/NPA Status unknown
32 Roeburn Way, Newcastle Upon Tyne, NE3 4QA
Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 2.25 metres, maximum height of extension 3.40 metres, total projection from rear wall of original house 4.50 metres.
-
2026/0925/01/NPA Status unknown
20 Hedley Street, Gosforth, Newcastle Upon Tyne, NE3 1DL
Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 2.83 metres, maximum height of extension 2.95 metres, total projection from rear wall of original house 4.97 metres.
-
2026/0760/01/NPA Status unknown
12 Gibside Gardens, Newcastle Upon Tyne, NE15 7PP
Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 3 metres, maximum height of extension 3 metres, total projection from rear wall of original house 5 metres.
-
2026/0663/01/NPA Granted
8 Birkdale Close, Newcastle Upon Tyne, NE7 7TP
Notification for Prior Approval: Erection of single storey extension to rear, height to eaves 2.80 metres, maximum height of extension 2.90 metres, total projection from rear wall of original house 4.60 metres.
-
2026/0618/01/NPA Granted
30 Chatton Wynd, Gosforth, Newcastle Upon Tyne, NE3 2ND
Notification for Prior Approval: Erection of a single storey extension to rear, height to eaves 3 metres, maximum height of extension 3.2 metres, total projection from rear wall of original house 5.2 metres