Planning application
Thoresby Vale Enabling Works Ollerton Road Edwinstowe
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Outline planning application for up to 75 dwellings (all matters reserved except access).
As published by the council, reference 26/00962/OUTM
Application record
- Reference
- 26/00962/OUTM
- Status
- Registered
- Received
- 24 Jun 2026
- Validated
- 4 Aug 2026
- Ward
- Edwinstowe And Clipstone
- Parish
- Edwinstowe
Site history
Applications at this address on the Newark and Sherwood register
This site has had 8 applications since 2024.
-
26/01052/DISCON Awaiting decision
Thoresby Vale Enabling Works Ollerton Road Edwinstowe
Request for confirmation of Discharge of Condition 9 (PLANTING IN VERGES) and Condition 14 (LANDSCAPING) attached to PP 23/02156/RMAM Application for Approval of Reserved Matters (Internal Access, Layout, Scale, Appearance and Landscaping) for Phase 4 (residential development of 114no. dwellings) including associated discharge of conditions 4, 6, 14, 17, 32 pursuant to Outline Application reference 16/02173/OUTM.
-
26/00963/S73M Awaiting decision
Thoresby Vale Enabling Works Ollerton Road Edwinstowe
Application to vary the wording of Condition 4, Condition 5, Condition 6 and Condition 14 attached to Planning Permission 16/02173/OUTM to remove the site area of Phase 8B and 8C from the approved plans of the original planning permission.
-
26/00963/S73 Status unknown
Thoresby Vale Enabling Works Ollerton Road Edwinstowe
Application to vary the wording of Condition 4, Condition 5, Condition 6 and Condition 14 attached to Planning Permission 16/02173/OUTM to remove the site area of Phase 8B and 8C from the approved plans of the original planning permission.
-
26/00373/RMA Status unknown
Thoresby Vale Enabling Works Ollerton Road Edwinstowe
Application for Approval of Reserved Matters (Internal Access, Layout, Scale, Appearance and Landscaping) pursuant to phase 6b and 6c (residential development of 117 dwellings) of Outline Application Ref. 16/02173/OUTM and associated discharge of conditions (condition numbers: 4, 7, 11, 12, 14, 16, 17, 18, 19, 22, 26, 31 and 32)
-
26/00254/DISCON Status unknown
Thoresby Vale Enabling Works Ollerton Road Edwinstowe
Request for confirmation of Discharge of Condition 2, Condition 5, Condition 6, Condition 7, Condition 10, Condition 13 attached to PP 23/02156/RMAM Application for Approval of Reserved Matters (Internal Access, Layout, Scale, Appearance and Landscaping) for Phase 4 (residential development of 114no. dwellings) including associated discharge of conditions 4, 6, 14, 17, 32 pursuant to Outline Application reference 16/02173/OUTM.
-
24/01340/DISCON Decided
Thoresby Vale Enabling Works Ollerton Road Edwinstowe
Request for confirmation of Discharge of Condition 11 (Construction Environmental Management Plan) attached to PP 16/02173/OUTM Residential Development up to 800 dwellings (Class C3), Strategic Employment Site comprising up to 4,855 sqm Class B1a, up to 13,760 sqm Class B1c, and up to 13,760 sqm Class B2, a new Country Park, a Local Centre, "The Heart of the New Community" containing a mix of leisure (to include zip wire), commercial, employment, community, retail (up to 500 sqm), health, and residential uses, a Primary School, Open Space and Green Infrastructure (including SUDS), and associated access works including the details of the primary access junctions into the site from Ollerton Road.
-
24/00409/DISCON Decided
Thoresby Vale Enabling Works Ollerton Road Edwinstowe
Request for confirmation of discharge of conditions 7(Scheme of Remediation), 11 (Construction Environment Management Plan), 12 (Site Waste Management Plan), 16 (Arboricultural Survey and Impact Assessment), 17 (Updated Extended Phase 1 Habitat Survey), 18 (Habitat Creation and Management Plan), 19 (External Lighting scheme), 22 (Surface Water and Foul Drainage Scheme), 26 (Details of New Roads) and 32 (Noise Assessment ) attached to planning permission 16/02173/OUTM - Residential Development up to 800 dwellings (Class C3), Strategic Employment Site comprising up to 4,855 sqm Class B1a, up to 13,760 sqm Class B1c, and up to 13,760 sqm Class B2, a new Country Park, a Local Centre, "The Heart of the New Community" containing a mix of leisure (to include zip wire), commercial, employment, community, retail (up to 500 sqm), health, and residential uses, a Primary School, Open Space and Green Infrastructure (including SUDS), and associated access works including the details of the primary access junctions into the site from Ollerton Road.
Timeline
Dates from the published record
-
24 Jun 2026
Received by Newark and Sherwood
-
4 Aug 2026
Validated
Checked as complete and ready for consideration.
-
8 Aug 2026
Added to PlanIndex
-
8 Aug 2026
Status changed to Registered
-
Decision
Awaiting decision
Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Newark and Sherwood took a median of 63 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file
851 applications on PlanIndex · across 151 councils · 87% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
53 documents on file for this application
- NATURAL ENGLAND
- ANNEX A WITH COMMENTS FROM NATURAL ENGLAND
- NSDC ENVIRONMENTAL HEALTH
- COMMENTS FROM NCC RIGHTS OF WAY
- COMMENTS FROM STRATEGIC HOUSING
- OLLERTON AND BOUGHTON TOWN COUNCIL
- MISS A CHADWICK
- SEVERN TRENT WATER
- MR BEN CHAMBERLAIN
- MISS NIAMH TEWSON
- NOTTINGHAMSHIRE POLICE DESIGNING OUT CRIME
- MS SHARON MARPLES
- NCC FLOOD TEAM
- NSDC CONSERVATION
- S BAILEY
- D COTTERILL
- C BARRETT
- G VICKERS-HILL
- MR PHILIP HINCH
- COMMENTS FROM HIGHWAYS
- CAROL WHYKE
- MRS CHELSEA BAXTER
- MISS REBECCA GUINNANE
- MR MARTYN LYNAM
- MR NICK COOPER
- MR ANDREW FROGGATT
- NATIONAL HIGHWAYS
- MAUREEN JORDAN
- MR DAVID ROSE
- ENVIRONMENT AGENCY
- MR TERENCE ASHTON
- LCC ARCHAEOLOGY
- NHS ESTATES
- NSDC EH CONTAMINATED LAND
- BNG STRATEGY REPORT
- BNG METRIC
- APPLICATION FORM - WITHOUT PERSONAL DATA
- AIR QUALITY ASSESSMENT
- BIODIVERSITY METRIC CALCULATION TOOL
- DESIGN AND ACCESS STATEMENT INC NATIONAL DESIGN GUIDE ASSESSMENT
- ECOLOGICAL APPRAISAL
- MARKETING EVIDENCE SUMMARY
- FLOOD RISK ASSESSMENT
- TECHNICAL NOTE - PLOT 8B AND 8C ANTICIPATED GROUND CONDITIONS
- ILLUSTRATIVE LANDSCAPE AND ECOLOGY MASTERPLAN
- SITE WIDE MASTERPLAN
- PHASE 8B, 8C LANDSCAPE AND PLAY STRATEGY
- LANDSCAPE AND VISUAL REPORT
- LANDSCAPE INFRASTRUCTURE
- TECHNICAL NOTE PARCELS 8B AND 8C NOISE
- PLANNING STATEMENT
- LOCATION PLAN PHASE 8C AND 8B
- TRANSPORT STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Newark and Sherwood for determination, against a statutory target of eight weeks. Over the last year Newark and Sherwood's median decision took 63 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Newark and Sherwood's portal will say. Our guide explains the common types.