Planning application
The Dukeries Academy Whinney Lane Ollerton NG22 9TH
Works: Demolition Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of new two-storey, modern secondary school building, with associated access, parking, sports facilities, landscaping. Demolition of existing school buildings
As published by the council, reference 26/00318/FULM
Application record
- Reference
- 26/00318/FULM
- Type
- Full Planning Permission Major
- Received
- 5 Mar 2026
- Validated
- 6 Mar 2026
- Ward
- Ollerton
- Parish
- Boughton
- Postcode
- NG22 9TH
Site history
Applications at this address on the Newark and Sherwood register
This site has had 2 applications since 2026: 1 approved, 0 refused.
-
26/00838/PA Granted
The Dukeries Academy Whinney Lane Ollerton NG22 9TH
Application to determine if prior approval is required for proposed installation of solar canopy on non-domestic, off street parking under Schedule 2, Part 14, Class OA.
Timeline
Dates from the published record
-
5 Mar 2026
Received by Newark and Sherwood
-
6 Mar 2026
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 June 2026, 13 weeks from validation under the statutory target. Extensions of time are common and are agreed case by case.
Newark and Sherwood took a median of 53 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Department For Education And Academy Transformation Trust Applicant
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
95 documents on file for this application
- DRAFT ENGROSSMENT
- ECOLOGY TEAM COMMENTS
- BAT REPORT
- HABITAT MANAGEMENT AND MONITORING PLAN
- NSDC TREE CONSULTANT
- NSDC ENVIRONMENTAL HEALTH
- COMMENTS FROM ENV HEALTH
- NOISE IMPACT ASSESSMENT
- CONSTRUCTION METHOD STATEMENT
- CONSTRUCTION METHOD STATEMENT
- COVERING EMAIL - CONSTRUCTION METHOD STATEMENT
- CONSERVATION
- NSDC ENVIRONMENTAL HEALTH
- TECHNICAL NOTE - CONTAMINATED LAND
- TECHNICAL NOTE - CONTAMINATED LAND
- ENVIRONMENTAL HEALTH OFFICER
- RESPONSE TO SPORT ENGLAND COMMENTS
- NCC HIGHWAYS
- NSDC PLANNING POLICY
- COMMENTS FROM SPORT ENGLAND
- CORRIE GREEN
- I AND K GARDINER
- NCC PLANNING POLICY
- S BELL
- OLLERTON TOWN COUNCIL
- NCC FLOOD
- CADENT GAS SITE LOCATION
- INDIGO PIPELINES LOCATION PLAN
- INDIGO PIPELINES GENERAL CONDITIONS
- NSDC ENV HEALTH
- PAUL GREEN
- STEVEN GREEN
- THE COAL AUTHORITY
- NATIONAL HIGHWAYS
- REVISED APPLICATION FORM
- BNG METRIC CALCULATION
- SUPPLEMENTARY GROUND INVESTIGATION REPORT
- TRAVEL PLAN
- TRANSPORT STATEMENT ADDENDUM
- TRANSPORT STATEMENT
- BUILT HERITAGE STATEMENT
- SUPERSEDED CONSTRUCTION METHOD STATEMENT
- BALL STRIKE RISK ASSESSMENT
- AGRONOMY REPORT
- APPENDIX A -FUTURE OF SECONDARY EDUCATION AT THE DUKERIES ACADEMY CONSULTATION P
- APPENDIX B - LEAFLET PUBLIC CONSULTATION
- APPENDIX C - EXHIBITION BOARDS INTRODUCTION AND VISION
- 3D INTERNAL VIEWS SHEET 2
- SHADOW HABITATS REGULATIONS ASSESSMENT
- GROUND FLOOR GA PLAN
- FIRST FLOOR GA PLAN
- ROOF GA PLAN
- GA ELEVATIONS SHEET 01
- GA ELEVATIONS SHEET 02
- GA SECTIONS SHEET 01
- GA SECTIONS SHEET 02
- 3D EXTERNAL VIEWS SHEET 1
- 3D EXTERNAL VIEWS SHEET 2
- 3D INTERNAL VIEW SHEET 1
- DESIGN AND ACCESS STATEMENT PART 1
- DESIGN AND ACCESS STATEMENT PART 2
- DESIGN AND ACCESS STATEMENT PART 3
- PHASE I GEOENVIRONMENTAL SITE ASSESSMENT
- PHASE 2 GEOENVIRONMENTAL SITE ASSESSMENT
- BIODIVERSITY NET GAIN REPORT
- BIODIVERSITY NET GAIN REPORT FIGURES 1-5
- ECOLOGICAL APPRAISAL
- ARBORICULTURAL ASSESSMENT AND METHOD STATEMENT
- STRUCTURAL APPRAISAL
- NOISE IMPACT ASSESSMENT
- SITE LOCATION PLAN
- EXISTING SITE PLAN
- EXISTING SITE PLAN
- WHOLE SITE PLAN
- VEHICLE CIRCULATION STRATEGY
- GENERAL ARRANGEMENT EXTERNAL SPORTS PROVISION
- GENERAL ARRANGEMENT GREEN INFRASTRUCTURE PROVISION
- GENERAL ARRANGEMENT EXTERNAL WORKS PLAN SHEET 1 OF 6
- GENERAL ARRANGEMENT EXTERNAL WORKS PLAN SHEET 2 OF 6
- GENERAL ARRANGEMENT EXTERNAL WORKS PLAN SHEET 3 OF 6
- GENERAL ARRANGEMENT EXTERNAL WORKS PLAN SHEET 4 OF 6
- GENERAL ARRANGEMENT EXTERNAL WORKS PLAN SHEET 5 OF 6
- GENERAL ARRANGEMENT EXTERNAL WORKS PLAN SHEET 6 OF 6
- SITE LANDSCAPING PLAN SHEET 1 OF 6
- SITE LANDSCAPING PLAN SHEET 2 OF 6
- SITE LANDSCAPING PLAN SHEET 3 OF 6
- SITE LANDSCAPING PLAN SHEET 4 OF 6
- SITE LANDSCAPING PLAN SHEET 5 OF 6
- SITE LANDSCAPING PLAN SHEET 6 OF 6
- BUILDING DEMOLITION PLAN
- SITE SECTIONS
- SUPPORTING PLANNING STATEMENT INC OPEN SPACE ASSESSMENT AND DRAFT HEADS OF TERMS
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
- STATEMENT OF COMMUNITY INVOLVEMENT
- COMMUNITY USE STATEMENT
Trade members open them from here.
Open the documentsChecking the current position
The published feed does not show a live status for this application; the register on Newark and Sherwood's own portal holds the authoritative version.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Dukeries Leisure Centre Dukeries Complex Main Road Boughton Nottinghamshire NG22 9JJ
New swimming pool, associated changing rooms and plant on the car park adjacent to the Dukeries Leisure Centre
Granted Full applications 22 docs -
Brigade Training Centre Dukeries Complex Whinney Lane Boughton Newark On Trent Nottinghamshire NG22 9JE
Proposed bulk LPG storage facility.
Granted Full applications 1 doc -
The Dukeries Academy Whinney Lane Ollerton NG22 9TH
Application to determine if prior approval is required for proposed installation of solar canopy on non-domestic, off street parking under Schedule 2, Part 14, Class OA.
Granted Prior approval 8 docs -
56 Main Road Boughton NG22 9JD
Installation of a log cabin within the rear garden.
Granted Full applications 12 docs -
Parkgate Academy Whinney Lane Ollerton NG22 9TH
Erection of a new refectory, kitchen and community cafe building
Granted Full applications 11 docs -
102 Whinney Lane Ollerton NG22 9TZ
Single storey front extension (part retrospective) Re-submission of 22/01453/HOUSE.
Refused Full applications Extension 20 docsSmall domestic
Other full applications
In Newark and Sherwood
-
26/00949/FUL Granted
The Saddle Fit Centre Norwell Lane Brough Newark On Trent NG24 2PE
Change of use and conversion to one dwelling
-
26/00942/FUL Granted
Mill Close Farm Cottage Lane Collingham Newark On Trent NG23 7QL
Conversation of barn to dwelling, demolition of a agricultural building, erection of a replacement ancillary rural outbuilding incorporating garage, workshop, office and incidental accommodation, together with associated landscaping, ecological enhancements and associated works.
-
26/01372/FUL Awaiting decision
Clay Barn Main Street Maplebeck Newark On Trent NG22 0BS
Siting of four bell tents measuring 4m x 4m for accommodation use. Erection of a 2 bay cart shed , installation of 6 solar panels to the roof of the existing fort and creation of a new driveway and car park
-
26/00998/FUL Granted
Sherwood House Rufford Colliery Lane Rainworth NG21 0HR
Change of use from a C2 hospital to a C2a secure residential institution and minor works to the building and site
-
26/00679/FUL Granted
12 Overman Drive Edwinstowe NG21 9ST
Change of use of an existing three-bedroom dwelling into a self-contained short-term holiday let for upto 6 people