Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Gilbert Way Blidworth

Status unknown Newark and Sherwood 25/00670/FUL Full Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed industrial units.

As published by the council, reference 25/00670/FUL

Application record

Reference
25/00670/FUL
Type
Full Planning Permission
Received
17 Apr 2025
Validated
26 Sep 2025
Ward
Rainworth South And Blidworth
Parish
Blidworth

Timeline

Dates from the published record

  1. 17 Apr 2025

    Received by Newark and Sherwood

  2. 26 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Newark and Sherwood took a median of 63 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

Checking the current position

The process from here

The published feed does not show a live status for this application, which usually means the council register holds more recent detail than the copy PlanIndex receives.

The council portal linked on this page carries the authoritative version, including the documents, any consultation deadline and the decision once made. PlanIndex refreshes its copy of the register on a daily cycle.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Newark and Sherwood

  • 26/00097/HOUSE Granted

    8 Manor Walk Epperstone NG14 6RP

    Installation of a porch with a traditional tiled roof

    21 Jan 2026 Full applications
  • 26/00679/LDCP Granted

    12 Overman Drive Edwinstowe NG21 9ST

    Change of use of an existing three-bedroom dwelling into a self-contained short-term holiday let for upto 6 people

    7 May 2026 Full applications
  • 26/00639/HOUSE Granted

    The Quadrant 118A Lower Kirklington Road Southwell NG25 0DX

    Proposed 2 storey rear extension, replacement cladding to front elevation, few fenestration and lean-to roof over existing porch

    28 Apr 2026 Full applications
  • 26/00783/HOUSE Granted

    The Crest 11 Great North Road Sutton On Trent NG23 6QW

    Installation of ground mounted solar panels

    26 May 2026 Full applications
  • 26/00560/FUL Withdrawn

    Land At 78 Swinderby Road Collingham Newark On Trent NG23 7PB

    Proposed dwelling and existing dropped kerb to be extended.

    14 Apr 2026 Full applications