Planning application
Land South Of Weston Road Egmanton
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use of land to a travellers site including ancillary hardstanding, day rooms, and access
As published by the council, reference 25/00629/FUL
Application record
- Reference
- 25/00629/FUL
- Type
- Full Planning Permission
- Received
- 8 Apr 2025
- Validated
- 25 Apr 2025
- Ward
- Sutton On Trent
- Parish
- Egmanton
Timeline
Dates from the published record
-
8 Apr 2025
Received by Newark and Sherwood
-
25 Apr 2025
Validated
Checked as complete and ready for consideration.
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 June 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Newark and Sherwood took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
86 documents on file for this application
- ARBORICULTURAL METHOD STATEMENT
- REVISED BNG STRATEGY
- BASELINE HABITAT PLAN
- CREATION AND ENHANCEMENT PLAN
- ARBORICULTURAL REPORT
- BNG CALCS
- TREE PROTECTION PLAN
- MRS A BIRD
- MRS J TATE
- MRS J TATE
- MRS J TATE
- A NEEDHAM
- ASPBURY PLANNING ON BEHALF OF EGMANTON PARISH
- NSDC TREE CONSULTANT
- MRS R JACKSON
- MR R CASHMORE
- PRELIM ACCESS & CARAVAN SWEPT PATH ANALYSIS
- PROPOSED ACCESS VISIBLITY SPLAYS
- LOCATION PLAN
- VISIBILITY SPLAY PLAN
- REVISED PROPOSED SITE PLAN
- MRS AMANDA BIRD
- AMENDED APPLICATION FORM - WITHOUT PERSONAL DATA
- HAZEL SMITH
- MRS JANETTE TATE
- NSDC ECOLOGY TEAM COMMENTS
- J TATE
- J TATE
- J TATE
- J TATE
- NSDC ECOLOGY TEAM COMMENTS
- SITE PLAN
- SITE PLAN
- AMENDED BNG STATEMENT
- AMENDED BNG METRIC
- PROPOSED SITE PLAN
- NCC HIGHWAYS
- RESPONSE TO NCC HIGHWAYS
- RESPONSE TO NCC HIGHWAYS
- NSDC PLANNING POLICY
- MR L BOARER
- J BOND
- GDR MARTIN
- M CHILVERS
- P AND E BEARDALL
- S BUNNELL
- P BARBER
- DENISE KNIPE - ASPBURY PLANNING
- S FLETCHER
- MR AND MRS J TATE
- G BIRD
- R MONTGOMERY
- R WHALL
- K SHAW
- C MORAN
- S BUNNELL
- S AISTRUP
- M AISTRUP
- J BOWER
- H SMITH
- GILLIAN CUPIT
- TIM CUPIT
- L OUTRAM
- D NEEDHAM
- T BIRD
- A A NEEDHAM
- AMY NEEDHAM
- R ALLARTON
- S GREATOREX
- NCC HIGHWAYS
- MARCUS WRIGHT
- JAMES NEEDHAM
- E MILLER
- MRS A LONGMUIR
- MRS AMANDA BIRD
- STATIC CARAVAN FLOOR PLAN AND ELEVATIONS
- APPLICATION FORM - WITHOUT PERSONAL DATA
- LOCATION PLAN
- PROPOSED SITE PLAN
- DAY ROOM FLOOR PLAN AND ELEVATIONS
- EXISTING SITE PLAN
- BIODIVERSITY NET GAIN ASSESSMENT
- DRAINAGE ASSESSMENT
- PRELIMINARY ECOLOGICAL APPRAISAL
- DESIGN, ACCESS AND PLANNING STATEMENT
- BIODIVERSITY METRIC CALCULATION TOOL
Watch members (£5 a month) open the document list from here.
Open the documentsChecking the current position
The published feed does not show a live status for this application; the register on Newark and Sherwood's own portal holds the authoritative version.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Newark and Sherwood
-
26/01616/FUL Awaiting decision
Meadow View Fiskerton Road Rolleston Newark On Trent NG23 5SH
Proposed New Dwelling.
-
26/01104/FUL Granted
Travis Perkins Brunel Drive Newark On Trent NG24 2DE
Relocation of loading bay within existing builders merchants yard and introduction of one-way system
-
26/00747/FUL Withdrawn
Sherwood Restorations Ltd Upton Road Southwell NG25 0QB
Change of use of existing industrial building to Use Class E (for the sale and display of kitchens and bathrooms) together with an extension to rear and external alterations
-
26/01138/FUL Granted
38 & 39 Eakring Road Bilsthorpe NG22 8PX
Widen drop kerb both sides for shared drive access.
-
26/01134/FUL Granted
Mill Farm Gonalston Lane Hoveringham NG14 7JJ
Temporary seasonal change of use of agricultural barn between May and September (inclusive) in connection with existing wedding venue.