Ward · Neath Port Talbot
Planning applications in Aberavon
Page 2 of 2, newest first. Back to the Aberavon overview.
Applications in Aberavon
Newest first · page 2 of 2
-
P2021/0793 Granted
35 Fenbrook Close Aberavon Port Talbot SA12 7PA
Replacement front porch and single storey rear extension to replace existing conservatory.
-
P2021/0766 Granted
65 Pentre Afan Aberavon SA12 7RN
Proposed 1.8m high brick wall and pillars to part of the side boundary to replace the existing fence.
-
P2021/0745 Decided
99 Westlands Aberavon SA12 7DE
Single storey rear extension - Lawful Development Certificate Proposed.
-
P2021/0711 Withdrawn
74 Windsor Village Aberavon SA12 7EY
Change of use of land into garden curtilage enclosed by extension of existing boundary wall.
-
P2021/0696 Granted
28 Westlands Aberavon Port Talbot Neath Port Talbot SA12 7BW
Retrospective application for the retention of domestic outbuilding and means of enclosure.
-
P2021/0661 Granted
49 Brooklyn Gardens Aberavon Port Talbot SA12 7PJ
Single storey side/rear extension
-
P2021/0589 Granted
Water Street Business Centre Gwyn Terrace Aberavon Port Talbot SA12 6LF
Change of use of Room 18, located at the rear of Water Street Business Centre from Office (A2) to Tattoo Removal (D1)
-
P2021/0567 Granted
4 Dalrymple Street Aberavon Port Talbot SA12 6DY
Change of use from a Dwellinghouse (C3) to a children's home (C2)
-
P2021/0467 Granted
28 Westlands Aberavon Port Talbot SA12 7BW
Single storey side extension to replace existing garage and widen parking area within front curtilage.
-
P2019/5520 Decided
4 Lister Avenue Aberavon SA12 6YB
Construction of single storey shower room extension to rear of property
-
P2019/5517 Granted
Baglan Industrial Park, Unit 34 Aberavon Road Aberavon SA12 7DJ
Retention of detached vehicle maintenance workshop and laying of stone chippings to form hard standing/storage and vehicle access areas
-
P2019/5501 Granted
Unit 34 Baglan Industrial Park Aberavon Road Aberavon SA12 7DJ
Retention of two-storey rear extension and extended car parking facilities, plus construction of a new single-storey reception area to front elevation and drainage pond to rear.