Planning application
P2026/0415
Unit 12 Seaway Parade Industrial Estate Baglan Neath Port Talbot SA12 7BR
Proposal
Certificate of Lawfulness for the proposed use of no more than 25% of the industrial unit as an ancillary showroom
As published by the council, reference P2026/0415
Timeline
Dates from the published record
-
26 Jun 2026
Received by Neath Port Talbot
-
23 Jul 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Neath Port Talbot for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
P2025/0648 Withdrawn
Unit 14 Seaway Parade Industrial Estate Baglan Neath Port Talbot SA12 7BR
Retrospective application for the change of use of landscaped area to parking, boundary wall, the siting of a shipping container and proposed landscaping
-
P2025/0592 Awaiting decision
Unit 4 Seaway Parade Industrial Estate Baglan Neath Port Talbot SA12 7BR
Construction of an extension to existing industrial unit.
-
P2025/0578 Granted
Land Off Central Avenue Seaway Parade Industrial Estate SA12 7BU
Discharge of condition 3 (construction environmental management plan) of planning permission P2025/0222 for the construction of a hydrogen production facility.
-
P2025/0778 Granted
Land Off Central Avenue Seaway Parade Industrial Estate Neath Port Talbot SA12 7BU
Section 73 application to vary condition 2 (approved plans) of planning permission P2025/0222 approved 23/06/25 for the Construction and operation of the hydrogen production facility including associated compression, lightning masts, storage and infrastructure and a hydrogen tube-trailer filling station. To include three additional lightning masts, re-orientation of several pieces of plant and equipment and additional equipment and infrastructure.
Other lawful development applications
In Neath Port Talbot
-
P2026/0380 Decided
11 Park Howard Road Cwmgors Neath Port Talbot SA18 1NZ
Certificate of Lawful Development (existing) for the siting of a wooden structure to side of dwelling to sell food produce (cake shed), operating on Friday, Saturday and Sunday from 3pm until 6 pm
-
P2026/0433 Decided
22 Giants Grave Road Briton Ferry Neath Port Talbot SA11 2LS
Proposed Lawful Development Certificate of a replacement outbuilding at rear of garden
-
P2026/0418 Decided
163 Western Avenue Sandfields Neath Port Talbot SA12 7ND
Proposed Lawful Development Certificate of a single storey rear extension
-
P2026/0381 Decided
18 St Catherines Court Baglan Neath Port Talbot SA12 8AJ
Proposed Lawful Development Certificate for an air source heat pump to side of dwelling
-
P2026/0311 Withdrawn
Land West Of 1B Broomhill Port Talbot Neath Port Talbot SA13 2US
Certificate of Existing Lawful Development for the use of land as part of a domestic garden