Planning application

Margam Substation Margam SA13 3NF

Granted Neath Port Talbot P2025/0817 Full Plans

Works: Extension Demolition

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Full planning application for the extension of the Margam 275kV substation including the erection of a gas insulated switchgear hall (GIS hall) and the demolition of the existing control and amenities buildings to enable the erection of a new amenities building. Works to also include earthworks, surface water management and drainage infrastructure, lighting, CCTV, boundary treatment, car parking, ecological improvements including a wildlife tower and gabion baskets, improved internal access roads, diesel generator and hardstanding, storage building and water storage tank, flood defence wall including flood gates and appropriate landscaping and other associated engineering operations.

As published by the council, reference P2025/0817

Application record

Reference
P2025/0817
Type
Full Plans
Status
Awaiting decision
Decision
Granted As published: Permitted
Received
19 Nov 2025
Validated
20 Nov 2025
Decided
17 Apr 2026
Ward
Margam & Taibach
Parish
Port Talbot
Postcode
SA13 3NF

Timeline

Dates from the published record

  1. 19 Nov 2025

    Received by Neath Port Talbot

  2. 20 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 17 Apr 2026

    Decision issued: Permitted

  4. 28 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

3 later applications on the register refer to this one:

  • P2026/0698 Awaiting decision

    Margam Substation Margam Port Talbot SA13 3NF

    Non-material Amendment to amend wording of conditions 2 (Approved Plans), Condition 15 (Construction Environmental Management Plan) and Condition 17 (Piling Strategy Controls) of application P2025/0817 - Full planning application for the extension of the Margam 275kV substation including the erection of a gas insulated switchgear hall (GIS hall) and the demolition of the existing control and amenities buildings to enable the erection of a new amenities building. Works to also include earthworks, surface water management and drainage infrastructure, lighting, CCTV, boundary treatment, car parking, ecological improvements including a wildlife tower and gabion baskets, improved internal access roads, diesel generator and hardstanding, storage building and water storage tank, flood defence wall including flood gates and appropriate landscaping and other associated engineering operations granted on 21/05/2026.

    Submitted 27 Oct 2026
  • P2026/0658 Awaiting decision

    Margam Substation Margam Port Talbot SA13 3NF

    Details to be agreed in association with condition 6 (Environmental Lighting Impact Assessment) and Condition 9 Construction and Timeline details for Flood Defence Wall) of application P2025/0817 - Full planning application for the extension of the Margam 275kV substation including the erection of a gas insulated switchgear hall (GIS hall) and the demolition of the existing control and amenities buildings to enable the erection of a new amenities building. Works to also include earthworks, surface water management and drainage infrastructure, lighting, CCTV, boundary treatment, car parking, ecological improvements including a wildlife tower and gabion baskets, improved internal access roads, diesel generator and hardstanding, storage building and water storage tank, flood defence wall including flood gates and appropriate landscaping and other associated engineering operations that was granted on 21/05/2026.

    Submitted 12 Oct 2026
  • P2026/0329 Granted

    Margam Substation Margam Neath Port Talbot SA13 3NF

    Details to be agreed in association with condition 4 (a landscape and habitat management programme) of application P2025/0817 granted on the 21/05/2026.

    Decided 26 May 2026

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Neath Port Talbot granted permission on 17 April 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Neath Port Talbot

  • P2026/0577 Awaiting decision

    60 Heol Y Felin Caewern Neath Port Talbot SA10 7SL

    Proposed access ramp to front of property

    Received 4 Sep, published by the council 2 Oct 2026 Full applications
  • P2026/0554 Awaiting decision

    27 Treforgan Road Crynant Neath Port Talbot SA10 8PW

    Proposed part single storey part two storey rear extension and front porch.

    Received 24 Aug, published by the council 16 Sep 2026 Full applications
  • P2025/0629 Granted

    Gnoll Nursing Home 27 Gnoll Park Road Neath Neath Port Talbot SA11 3BT

    Proposed single storey rear extension to existing care home, providing no.4 ensuite bedrooms with ancillary facilities, green roof and solar panels, workshop store, bin and bicycle storage. Retention of existing single storey rear extension and development of single storey rear extension facilitating stairway and store adjoining existing extension, and first floor extension facilitating no.4 ensuite bedrooms with ancillary facilities

    Received 1 Sep, published by the council 28 Jul 2026 Full applications
  • P2026/0123 Granted

    Keepers Lodge Lane From Church Road To Keepers Lodge Cilybebyll Pontardawe Neath Port Talbot SA8 3JS

    Demolition of existing dwelling and construction of replacement dwelling, solar panels on annex, associated external works comprising of boundary treatment, planting, permeable surfacing, and ancillary plant room (amended plans received 17/07/2026)

    Received 1 Mar, published by the council 28 Jul 2026 Full applications
  • P2026/0548 Awaiting decision

    100 Main Road Bryncoch Neath Port Talbot SA10 7TL

    Retrospective planning permission for the replacement of an existing conservatory with a single-storey rear extension, together with a raised patio and access steps

    Received 19 Aug, published by the council 2 Sep 2026 Full applications