Skip to content
PlanIndex Get alerts
Menu

Planning application

P2025/0754

Cardonnel Court Cardonnel Road Skewen Neath Port Talbot SA10 6BS

Granted Neath Port Talbot Full Plans

Proposal

Construction of a residential care facility with associated works

As published by the council, reference P2025/0754

Timeline

Dates from the published record

  1. 24 Oct 2025

    Received by Neath Port Talbot

  2. 27 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 15 Jun 2026

    Decision issued: Approved

  4. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • P2026/0403 Awaiting decision

    Cardonnel Court Cardonnel Road Skewen Neath Port Talbot SA10 6BS

    Details submitted pursuant to condition 4 (Construction Environmental Management Plan) of planning permission P2025/0754 dated 16.06.2026 (for construction of a residential care facility with associated works) SIGNED VERSION OF CEMP RECEIVED

    17 Jun 2026 5m away Conditions
  • P2025/0811 Awaiting decision

    Derwen Plant Ltd Neath Abbey Wharf Neath Abbey Wharf Access Road Skewen Neath Port Talbot SA10 6BL

    Part retrospective application for the proposed installation of portable concrete manufacturing plant to be used in association with the existing business and the general public (amended Site Location Plan submitted 08/06/2026) (Amended drawings/plans (site plan, swept path, parking arrangements, drainage plan) submitted 08/06/2026) (Amended supporting documents (noise assessment, tree survey, drainage statement, covering letter, GIS, FCA, planning and transport statement) submitted 08/06/2026

    18 Nov 2025 226m away Full applications
  • P2025/0651 Decided

    54 Parc Wern Skewen Neath Port Talbot SA10 6AX

    Proposed lawful development certificate- part demolish and rebuild existing single storey side extension and alter roof design of existing single storey side/rear extension from a pitched to gable roof.

    11 Sep 2025 411m away Lawful development

In Neath Port Talbot

  • P2026/0404 Withdrawn

    3 Tai'r Ynys Fawr Pontrhydyfen Neath Port Talbot SA12 9RU

    Rear single storey bedroom, shower room and porch extension

    17 Jun 2026 Full applications
  • P2026/0159 Granted

    44 Leyshon Road Gwaun Cae Gurwen Neath Port Talbot SA18 1EN

    Proposed two storey rear extension (amended location and site plan received 24/06/2026).

    18 Mar 2026 Full applications
  • P2026/0263 Granted

    3 Heol Y Gwrgan Margam Neath Port Talbot SA13 2DG

    Retention and completion of a detached garage

    27 Apr 2026 Full applications
  • P2026/0491 Awaiting decision

    7 Plas Road Rhos Pontardawe Neath Port Talbot SA8 3HD

    Retrospective application for a single storey rear extension in addition to a raised decking area.

    22 Jul 2026 Full applications
  • P2026/0353 Granted

    61 Neath Road Briton Ferry Neath Port Talbot SA11 2DX

    Proposed replacement of a uPVC framed shop front to aluminium

    1 Jun 2026 Full applications