Planning application
Land to the rear of 62-64, South Street, Dorking, Surrey, RH4 2HD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 1 No. one a half storey dwelling.
As published by the council, reference MO/2022/1956
Application record
- Reference
- MO/2022/1956
- Type
- Detailed
- Status
- Determined
- Decision
- APPROVED WITH CONDITIONS
- Received
- 17 Nov 2022
- Validated
- 17 Nov 2022
- Decided
- 27 Jan 2023
- Ward
- Dorking South
- Parish
- Dorking (Unparished)
- Decision by
- Delegated
- Postcode
- RH4 2HD
Timeline
Dates from the published record
-
17 Nov 2022
Received by Mole Valley
-
27 Jan 2023
Decision issued: APPROVED WITH CONDITIONS
-
19 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Applicant on file
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land r/o Junction Mews, Junction Road, Dorking, Surrey, RH4 3HB
Crown lift 5 No. Lime trees (marked T1 on submitted plan) to provide 5 metres ground clearance and crown thin the re-gorwths by 20%.
Granted Trees 6 docs -
80-82, South Street, Dorking, Surrey, RH4 2HD
Discharge of Conditions 3 and 4 of planning permission MO/2021/1740 for the conversion of first and second floors from office to 2 No. flats including blocking up of modern window on rear elevation and internal alterations(application for listed building consent).
Split decision Conditions New dwelling Windows or glazing 17 docsSeveral homes -
3 FLAT 2 VICTORIA TERRACE DORKING RH4 2LD
T1 Sycamore reduce the overall size of crown by aproximately 2 meters back to previous reduction points and clear all phone wires. This tree is causing excessive shading.
Granted Trees 4 docs -
A K G FINANCIAL ANALYTICS LTD ANDERTON HOUSE, 92 SOUTH STREET DORKING RH4 2EW
Discharge of Condition 4 of approved planning application MO/2025/0452 for amendments and enlargements to existing windows and doors, introduction of new windows and rooflights.
Granted Conditions Loft or dormer Windows or glazing 14 docs -
A K G FINANCIAL ANALYTICS LTD ANDERTON HOUSE, 92 SOUTH STREET DORKING RH4 2EW
Discharge of Condition 1 of approved planning application MO/2025/1127 for the prior notification under Class MA Conversion from Use Class E to Use Class C3 Residential, to create 3 No. dwelling.
Granted Conditions 5 docsSeveral homes -
38-40, South Street, Dorking, Surrey, RH4 2HQ
Discharge of condition 5 of approved planning permiossion MO/2020/0125 for the proposed change of use from Class B1 (Office) to use Class C3 (Dwellinghouse) and the reorganisation of the internal layout to suit. (Listed Building Consent)
Granted Conditions 11 docsDomestic
Other full applications applications
In Mole Valley
-
MO/2026/00920 Granted
KINGS COURT 41-51 KINGSTON ROAD LEATHERHEAD KT22 7SL
Installation of one new condenser unit within the existing plant enclosure at roof level.
-
MO/2026/00917 Granted
FARM LANE NURSERIES FARM LANE ASHTEAD KT21 1LY
Removal of unsafe polytunnels and existing brick sand and shingle base across site and replacement with new hardcore and chippings and new concrete path linking nurseries.
-
MO/2025/02579 Granted
COAST HILL FARM COAST HILL FARM SHEEPHOUSE LANE WOTTON RH5 6QH
Change of use to light industrial (Use Class E(g)(iii)) and storage (Use Class B8) with external changes to building, infilling of bays with provision of a fire exit door and staircase and window on the northern elevation.
-
MO/2026/00726 Refused
ENTERPRISE HOUSE 4 CURTIS ROAD DORKING RH4 1EJ
Changes to fenestration involving amendments to existing fenestration and insertion of new fenestration at ground, first and second floor level and new doors at ground floor level on the north and south elevations.
-
MO/2025/1117 Granted
Dorking Lawn Tennis And Squash Club, Roman Road, Dorking, Surrey, RH4 3ET
Installation of new floodlights on courts 8 and 9. Replacement of existing floodlights on courts 2, 3, 4 and 5.