Planning application

Eastern Way Quarries, Land to the North and South of Eastern Way, Heath and Reach

Granted Milton Keynes PLN/2026/1622 Adjoining Authority Consultation

Works: Extension Demolition Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Consultation from Central Bedfordshire Council on application ref. CB/26/02378/DB seeking permission for Development Brief relating to Hybrid Planning Application (Environmental Impact Assessment application) comprising: Part A – Full planning permission for 2 wind turbines with associated accesses, repowering through the life extension of the existing 'Double Arches' and 'Checkley Wood' wind turbines, solar arrays; and associated infrastructure; provision of a roundabout and junction amendments between the A5 (Watling Street) and Eastern Way; new access and road from Shenley Hill Road; new roundabout, revised junctions, accesses and improvements along Mile Tree Road; new roundabout and access to the north of Eastern Way. Part B - Outline planning permission for a mixed-use scheme including up to 3,600 residential units (including affordable housing and specialist accommodation for older people); new employment and industrial floorspace and ancillary facilities; community infrastructure (including Narrow Gauge Railway terminus and museum); education facilities (including a secondary school and primary schools); healthcare provision; local centre uses (to include retail, community and employment uses); sports hubs (including sports provision); green infrastructure and landscaping works (to include a country park, formal and informal open space, amenity space, woodland and ecological areas); electrical vehicle charging facilities; transport mobility hubs; drainage works (including foul and surface water drainage infrastructure); vehicular and active travel infrastructure; ground remodelling, engineering and demolition works. All matters reserved save for principal points of access. The development is submitted as a phased and severable scheme, and each component of the development is capable of being delivered independently

As published by the council, reference PLN/2026/1622

Application record

Reference
PLN/2026/1622
Type
Adjoining Authority Consultation
Status
Decision Made
Decision
No Objection
Received
31 Jul 2026
Validated
31 Jul 2026
Decided
20 Aug 2026
Decision by
Delegated Decision

Site history

Applications at this address on the Milton Keynes register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • PLN/2026/1229 Awaiting decision

    Eastern Way Quarries, Land to the North and South of Eastern Way, Heath and Reach

    Consultation from Central Bedfordshire Council on application ref. CB/26/01392/OUT for the Hybrid Planning Application (Environmental Impact Assessment application) comprising: Part A – Full planning permission for 2 wind turbines with associated accesses, repowering through the life extension of the existing 'Double Arches' and 'Checkley Wood' wind turbines, solar arrays; and associated infrastructure; provision of a roundabout and junction amendments between the A5 (Watling Street) and Eastern Way; new access and road from Shenley Hill Road; new roundabout, revised junctions, accesses and improvements along Mile Tree Road; new roundabout and access to the north of Eastern Way. Part B - Outline planning permission for a mixed-use scheme including up to 3,600 residential units (including affordable housing and specialist accommodation for older people); new employment and industrial floorspace and ancillary facilities; community infrastructure (including Narrow Gauge Railway terminus and museum); education facilities (including a secondary school and primary schools); healthcare provision; local centre uses (to include retail, community and employment uses); sports hubs (including sports provision); green infrastructure and landscaping works (to include a country park, formal and informal open space, amenity space, woodland and ecological areas); electrical vehicle charging facilities; transport mobility hubs; drainage works (including foul and surface water drainage infrastructure); vehicular and active travel infrastructure; ground remodelling, engineering and demolition works. All matters reserved save for principal points of access. The development is submitted as a phased and severable scheme, and each component of the development is capable of being delivered independently

    Submitted 9 Jun 2026 Outline

Timeline

Dates from the published record

  1. 31 Jul 2026

    Received by Milton Keynes

  2. 10 Aug 2026

    Added to PlanIndex

  3. 20 Aug 2026

    Decision issued: No Objection

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Milton Keynes granted permission on 20 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Milton Keynes

  • PRE/2026/1848 Awaiting decision

    The Old Bus Station, 401 Elder Gate, Station Square, Central Milton Keynes, MK9 1LR

    Pre-Application submission for the the extension, alterations and partial change of use of existing building to multi-use arena [circa 12,000 sqm] (Sui Generis) together with ancillary [community/retail/commercial uses (Classes Ea), Eb) and F2b)] and all associated landscaping, public realm and infrastructure works.. Related to PPA ref: 26/07010/PPA

    2 Sep 2026 Outline
  • PLN/2026/1585 Refused

    Passenham Quarry, Buckingham Road, Deanshanger, MK19 6JT

    Re-consultation from North Northamptonshire Council on application ref. WNC/24/00008/MINFUL seeking permission for Proposed extension to Passenham Quarry including for the retention of existing ancillary works and facilities (including site access, haul road, processing plant, plant site, lagoons, weighbridge, wheel wash and all other approved ancillary facilities in place at the site) with progressive restoration to agriculture and nature conservation by the importation and deposit of inert restoration materials using the approved point of access

    22 Jul 2026 Outline
  • PLN/2026/1255 Granted

    Fulbrook Middle School, Weathercock Lane, Aspley Guise, Milton Keynes, MK17 8NP

    Consultation from Central Bedfordshire Council on application ref. CB/26/01678/VOC seeking permission for the variation of condition numbers 8, 9, 10, 13, 14, 15, 20, 21, 27 of planning permission CB/22/04785/REG3 (Construction of a two storey detached teaching block and a sports hall with plant, refurbishment, internal alterations, increased car parking, new pedestrian access and multi-use informal play area.) Variation Sought: Condition 9 relates to vehicular entrance gates which have been redesigned to accommodate larger vehicles. Other conditions relate to drawing updates to show amendments of the approved drawings to the final layouts as required by site levels and to show the new access. Conditions to be varied to record revised drawings updated from those approved.

    12 Jun 2026 Outline
  • PLN/2026/0707 Granted

    Former Hasmead Ltd, Mill Lane, Salford, Milton Keynes, MK17 8BY

    Consultation from Central Bedfordshire Council on application ref. CB/26/00403/FULL for the change of use of land and buildings to open storage (B8) with ancillary workshops (B2) and offices (E(g)(i)). Changes to the external area to include external racking, drainage, landscaping, siting of storage units, a cycle store and new parking.

    1 Apr 2026 Outline
  • PLN/2026/0533 Decided

    MILTON KEYNES UNIVERSITY HOSPITAL, STANDING WAY, EAGLESTONE, MILTON KEYNES, MK6 5LD

    Screening request under the Environmental Impact Assessment (EIA) Regulations 2017 relating to the demolition of existing building, enabling works including road realignment, and construction of up to 11-storey building for hospital use, with partial basement, new road layout and external works

    12 Mar 2026 Outline